My WebLink
|
Help
|
About
|
Sign Out
STAPLES RANCH SAFE STREET ETAL
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
A
>
ALAMEDA COUNTY
>
STAPLES RANCH SAFE STREET ETAL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2011 11:30:25 AM
Creation date
5/27/2011 11:28:32 AM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
8/3/2010
LONG TERM AGREEMENTS - NAME
STAPLES RANCH
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
LONG TERM AGREEMENTS - NOTES
SAFE STREETS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
will resolve all remaining environmental disputes related to Staples Ranch, including specifically <br />alkaline soil and riparian habitats. <br />The City, ACSPA, Safe Streets Pleasanton, Alameda Creek Alliance, and Center for <br />Biological Diversity hereby sign this Policy Statement, expressing actions that will be undertaken <br />by parties to this agreement, upon certain conditions being met, as further described below. <br />This Policy Statement is conditional upon and valid if and only if and when a legal <br />agreement between ACSPA, Alameda Creek Alliance, and Center for Biological Diversity <br />regarding outstanding biological issues related to the Staples Ranch development is signed and <br />made final. Discussions are currently underway between ACSPA, Alameda Creek Alliance, and <br />Center for Biological Diversity regarding these biological issues and the parties expect that <br />these discussions will be fruitful and that a final agreement will be signed by these three parties. <br />This Policy Statement shall have no force and no effect if this agreement regarding biological <br />issues is not signed and made final by ACSPA, Alameda Creek Alliance, and the Center for <br />Biological Diversity. <br />1. Prior to the start of construction of the Stoneridge Drive bridges, the City will hold a public <br />workshop in the Stoneridge Drive neighborhood detailing the mitigations and conditions <br />required for the opening of Stoneridge Drive to through traffic to and from El Charro Road; <br />and also providing participants with a timeline when milestones will occur. <br />2. A gate or barrier will be installed preventing through traffic to and from El Charro Road via <br />Stoneridge Drive. The gate or barrier will be accessible by public safety employees, Zone 7, <br />Wheels (Livermore Amador Valley Transit Authority) and other public agencies to meet the <br />public interest as deemed appropriate by the City of Pleasanton. <br />3. The gate or barrier will be located such that it allows access to the Auto Mali from either side <br />or both sides of the gate or barrier, but must be configured to inhibit through traffic from <br />using the proposed Auto Mall entry road to bypass the gate or barrier. The City may, from <br />time to time, move the gate or barrier to accommodate site development and activities <br />provided it continue to be installed preventing through traffic to and from El Charro Road via <br />Stoneridge Drive. <br />4. The gate or barrier on Stoneridge Drive will be removed allowing through traffic to and from <br />El Charro Road subject to the terms and conditions of the Regional Agreement when the <br />City of Livermore has opened Jack London Boulevard between Isabel Parkway and El <br />Charro Road as a two lane roadway (with four lanes at the intersection of El Charro Road <br />and Isabel Parkway). Two years after the opening of Stoneridge Drive as a two lane <br />roadway allowing through traffic to and from El Charro Road, the City Council shall have the <br />discretion to open the road to four lanes. Prior to doing so, the City shall evaluate traffic <br />data, solicit community input and schedule a public hearing for review and consideration of <br />the matter. <br />C:nf.policystatementfinal 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.