Laserfiche WebLink
ducts, vaults, manholes, meters, out-outs, switches, coemtunica- <br /> Lion circuits, appliances, attachments, appurtenances and any <br /> other property located or to be located in, upon, along, across, <br /> under or over the streets of the city, and used or useful in the <br /> transmitting and/or distributing of electricity; <br /> (e) The phrase "oonstruot, maintain and use" shall mean to construct, <br /> erect, install, operate, maintain, use, repair or replace. <br /> (f) The phrase "oonstitutional franchise" shall ran the right ac- <br /> quired through acceptance by said grantee or its predecessor in <br /> estate of the offer contained in the provisions of Section 19 of <br /> Article XI of the Constitution of the State of California, as <br /> said section existed prior to its amendment on October 10, 1911. <br /> Section 2. The franchise (1) to use, for transmitting and <br /> distributing electricity, suited for lighting, for use by consumers <br /> for any and all lawful purposes other than lighting, all poles, wires, <br /> conduits and appurtenances which are now or nay hereafter be lawfully <br /> placed and maintained in the public streets and places within said <br /> city under that certain franchise of grantee acquired pursuant to <br /> Section 19 of Article XI of the Constitution of the State of Califor- <br /> nia, as said section existed prior to its amendment or. October 10, <br /> 1911, and (2) to construct, maintain and use it said public streets <br /> and places all poles, wires, conduits and appurtenances, including <br /> communication circuits, whenever and wherever said constitutional fran- <br /> chise shall not be available therefor, necessary to transmit and dis- <br /> tribute electricity suited for, and for use by consumers for, any or all <br /> lawful purposes, is hereby granted to Pacific Gas and Electric Company, <br /> its successors and assigns. <br /> Section 3. Said franchise shall be indeterminate, that is <br /> to say, said franchise shall endure in full force and effect until the <br /> same shall, with the consent of the Public Utilities Commission of the <br /> State of California, be voluntarily surrendered or abandoned by the <br /> grantee, or until the state or some municipal or public corporation <br /> -2- <br />