My WebLink
|
Help
|
About
|
Sign Out
11 ATTACHMENT 04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2011
>
090611
>
11 ATTACHMENT 04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2011 4:25:48 PM
Creation date
8/26/2011 2:55:00 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/6/2011
DESTRUCT DATE
15Y
DOCUMENT NO
11 ATTACHMENT 04
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- 10 - <br /> Alternative 2 <br /> Limit freight train speed to no more than 15 mph within IOU ft. of the site. <br /> The implementation of the above recommended measures will reduce ground- <br /> borne vibration levels wi-hin the homes to less than 80 VdB. <br /> III. Site, Traffic, Railroad and Project Descriptions <br /> The planned project site is a 52.510 sq. ft. parcel located along Stanley Boulevard <br /> between Main Street and First Street in Pleasanton. The site is relatively flat and at-grade <br /> with Stanley Boulevard. The railroad tracks arc on a 2 0. high gravel berm. SunTounding <br /> land uses include mu ti-_amih residential adjacent to tie cast. single-family residential <br /> across Stanley Boulevarc to the south. commercial uses adjacent to the west and single- <br /> family residential is across the ra lroad tracks to the north. <br /> The primary sourles of noise at the site arc traffic on Stanley Boulevard and cal <br /> operations on the I.1PRR'ACE rail line. Stanley Bottles ard carries an existing Average <br /> Daily Traffic (.ADT) of 7 800 vehicles. as shown in the City of Pleasanton Noise Element <br /> Ref (d). <br /> the UPPR rail lire operated 8 daytime freight trains and 2 nighttime f freight trains <br /> on the first day of measurements. 6 daytime freight trains and 2 nighttime freight trains or <br /> the second day of measurements and 7 daytime and 4 nighttime trains on the third day of <br /> measurements. <br /> The ACE rail line services -I westbound trains in the morning and 4 eastbound <br /> trains in the afternoon. as reported by Altamont Commuter Express. Ref (d). Note that <br /> two of the westbound trains occur during the nighttime hours before 7:00 a.m. <br /> The planned project includes the construction of Il two-story single-family <br /> homes. Ingress and egress to the development will he by way of a project access street <br /> off of Stanley Boulevard. <br />
The URL can be used to link to this page
Your browser does not support the video tag.