Laserfiche WebLink
THE CITY OF <br /> III In .l.1 Iw <br /> pLEASANTON. <br /> • Enforce and/or comply with the State-mandated requirement that site-specific geologic <br /> reports be prepared for development proposals within Alquist-Priolo Earthquake Fault <br /> Zones, and restrict the placement of structures for human occupancy. Planning Division, <br /> Building Division, & Community Development Engineering. (LAND-a-1); <br /> • Require preparation of site-specific geologic or geotechnical reports for development and <br /> redevelopment proposals in areas subject to earthquake-induced landslides or liquefaction <br /> as mandated by the State Seismic Hazard Mapping Act in selected portions of the Bay <br /> Area where these maps have been completed, and condition project approval on the <br /> incorporation of necessary mitigation measures related to site remediation, structure and <br /> foundation design, and/or avoidance. Planning Division, Building Division, & <br /> Community Development Engineering. (LAND-a-2); <br /> • Recognizing that some faults may be a hazard for surface rupture, even though they do <br /> not meet the strict criteria imposed by the Alquist-Priolo Earthquake Fault Zoning Act, <br /> identify and require geologic reports in areas adjacent to locally-significant faults. <br /> Building Division & Community Development Engineering. General Plan Public Safety <br /> Element, Policies 5—7 regarding Geologic Hazards (LAND-a-3); <br /> • Recognizing that the California Geological Survey has not completed earthquake-induced <br /> landslide and liquefaction mapping for much of the Bay Area, identify and require <br /> geologic reports in areas mapped by others as having significant liquefaction or landslide <br /> hazards. Planning Division, Building Division, & Operations Service. (LAND-a-4); <br /> • Support and/or facilitate efforts by the California Geological Survey to complete the <br /> earthquake-induced landslide and liquefaction mapping for the Bay Area. GIS, <br /> Operations Services, & Building Division. (LAND-a-5); <br /> • Require that local government reviews of geologic and engineering studies are conducted <br /> by appropriately trained and credentialed personnel. GIS, Operations Services, & <br /> Building Division. (LAND-a-6); <br /> • Review development proposals to ensure that they incorporate required and appropriate <br /> fire-mitigation measures, including adequate provisions for occupant evacuation and <br /> access by emergency response personnel and equipment. LPFD. General Plan Public <br /> Safety Element Policies 8 to 13 regarding Fire Hazards and Emergency Response. <br /> (LAND-b-I); <br /> • Develop a clear legislative and regulatory framework at both the state and local levels to <br /> manage the wildland-urban-interface consistent with Fire Wise and sustainable <br /> community principles. LPFD. Adopted the urban-wildland interface guidelines in <br /> Pleasanton's Municipal Ordinance adoption. (LAND-b-2); <br /> 2010 Local Hazard Mitigation Plan Annex 30 September 1, 2011 <br /> City of Pleasanton <br />