My WebLink
|
Help
|
About
|
Sign Out
05
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2012
>
041712
>
05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2012 11:33:58 AM
Creation date
4/12/2012 11:33:43 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/17/2012
DESTRUCT DATE
15Y
DOCUMENT NO
05
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HIGHWAY EFFICIENCY AND FREIGHT INVESTMENTS <br /> The County's aging Berkeley,which will improve conditions for all <br /> highway system requires modes in both Emeryville and Berkeley. <br /> safety, access and gap The I-80 Gilman project will receive funding to <br /> closure improvements to relieve a major bottleneck and safety problem at the I- <br /> enhance efficiencies on a 80 Gilman interchange.The project includes both a <br /> largely built-out system. major reconfiguration of the interchange and grade <br /> Funding has been separation of the roadway and the railroad crossing <br /> which currently crosses Gilman at-grade impeding <br /> allocated to each highway corridor in traffic flow to and from the freeway.Improvements <br /> Alameda County for needed improvements. will also be made for pedestrians and bicyclists <br /> Specific projects have been identified based crossing this location and accessing recreational <br /> on project readiness, local priority and the opportunities west of the freeway,making this a true <br /> availability to leverage current investments multimodal improvement. <br /> and funds.A number of additional eligible The Ashby Avenue corridor will receive funding to <br /> projects have been identified as candidates fully reconstruct the Ashby Avenue Interchange by <br /> for corridor improvements,which will be eliminating the substandard eastbound on-ramp in <br /> selected for funding based on their Berkeley's Aquatic Park.The interchange will be fully <br /> contribution to the overall goals of improving accessible to vehicles traveling to and from <br /> Emeryville and Berkeley and east and west on I-80 <br /> system reliability, maximizing connectivity, will reduce local traffic congestion in Berkeley and <br /> improving the environment and reducing Emeryville and will improve bicycle and pedestrian <br /> congestion. Priority implementation of access.The project includes associated corridor <br /> specific investments and amounts will be improvements on Ashby Avenue. <br /> determined as part of the Capital , r 1,ills ea / •„m <br /> Improvement Program developed by the ,so� <br /> Alameda CTC every two years. / ,,1 <br /> Most of the projects that have been <br /> identified for funding are designed to t..-- <br /> '” > 4 03 <br /> - r <br /> improve the efficiency of and access to ��� �-� <br /> --i - III <br /> existing investments and to close gaps and - <br /> remove bottlenecks. ,,1 . ' t <br /> ti <br /> A total of 9%of the net revenue is allocated lik to the highway system, including 1%o, or =:- �'� r approximately $77 M, allocated specifically to '\\ �'�goods movement and related projects. , Sit 1111111 <br /> el <br /> I-8o CORRIDOR INVESTMENTS FROM 0 1 _ Iii <br /> THE CONTRA COSTA COUNTY LINE TO \l, �_i r THE BAY BRIDGE ($76 M) : \ _1 <br /> I-80 in the northern part of the County is the most _.-__ __— <br /> congested stretch of freeway in the Bay Area. - " W y <br /> Investments in the interchanges on this route were ��"'" �5-- S <br /> selected to relieve bottlenecks,improve safety and Art 0 1' , gi <br /> improve conditions for cars,buses,trucks and <br /> bicyclists and pedestrians.Key investments will be horJlurtratvopurpro.ONy 1 _Lila:�lQiid il>ite: <br /> made at the Ashby and Gilman interchanges in <br /> Alameda County Transportation Expenditure Plan I 2-15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.