My WebLink
|
Help
|
About
|
Sign Out
1992
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
LABOR AGREEMENTS
>
MANAGEMENT
>
1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2012 3:21:22 PM
Creation date
10/29/2012 3:21:21 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
4/1/1998
LONG TERM AGREEMENTS - NAME
MANAGEMENT COMPENSATION PLAN
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
20 YR
LONG TERM AGREEMENTS - NOTES
509-05
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit B <br /> Management Base Salary Plan <br /> I. Introduction; The following is a description of the <br /> basic tenets of the city's performance pay plan for <br /> management personnel. <br /> II. Salary Grades: Salary grades with a 50% dollar range <br /> from the minimum of the grade to the maximum of the grade <br /> shall be established. Each management position shall be <br /> assigned to a salary grade. <br /> III. Control Point: For each salary grade a control point <br /> shall be established. The control point shall be the <br /> midpoint of the salary grade. The midpoint represents <br /> the value of each position assigned to the salary grade <br /> at the fully competent level. <br /> IV. Performance zones: Each salary grade shall be divided <br /> into four performance zones as follows: <br /> -- Zone One (80% through 95% of control point): This <br /> portion of the grade is typically considered to be <br /> that into which a new employee is hired. However, <br /> where circumstances warrant, employees may be hired <br /> up to the control point. <br /> - - Zone Two (96% through 103% of the control point): <br /> This is the portion of the salary grade to which an <br /> employee may normally expect to progress. Most <br /> employees will achieve and maintain a salary within <br /> this portion of the range. <br /> - - Zone Three (104% through 111% of the control <br /> point): Only those employees whose performance, <br /> over time, exceeds expectations will achieve and <br /> maintain a salary that falls within this portion of <br /> the range. <br /> -- Zone Four (112% through 120% of the control point): <br /> Only those employees whose performance, over time, <br /> far exceeds expectations will achieve and maintain <br /> a salary that falls within this portion of the <br /> range. <br /> - 23 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.