My WebLink
|
Help
|
About
|
Sign Out
PLEASANTON HACIENDA I LP (2)
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
P
>
PLEASANTON HACIENDA I LP (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2014 2:00:00 PM
Creation date
1/18/2013 11:55:00 AM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
10/16/2007
LONG TERM AGREEMENTS - NAME
PLEASANTON HACIENDA I LP
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
LONG TERM AGREEMENTS - NOTES
HACIENDA MOBILEHOME
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CAPITAL IMPROVEMENTS <br /> I. Replace perimeter fencing [street segment by March 31, 2008, 1/3 by July 31, 2008, and <br /> 1/3 by December 31, 2008]. <br /> 2. Sidewalk and Owner installed driveways: Maintenance Committee shall identify by <br /> October 31, 2007 those sidewalks that are to be repaired/replaced using a differential of <br /> more than 1/2" as the standard to warrant repair/replacement, and 1/3 shall be replaced by <br /> December 31, 2007, 1/3 by June 30, 2008 and 1/3 by December 31, 2003. The <br /> Maintenance Committee shall identify by December 31, 2007 those Owner installed <br /> driveways that are to be repaired/replaced using the same standard as above. Owner shall <br /> repair/replace 1/3 by June 30, 2008, 1/3 by December 31, 2008 and the remaining 1/3 by <br /> June 30, 2009. In July 2009 and January 2011 the Maintenance Committee shall identify <br /> other sidewalks and Owner installed driveways (if any) that are to be repaired/replaced. <br /> 3. Street lights: all street lights are to be operational by December 31, 2007. All lighting <br /> around the Clubhouse and within the common areas/walkways/greenbelts is to be <br /> operational by March 31, 2008. <br /> 4. Clubhouse: The roof of the clubhouse shall be inspected by a licensed roofing contractor <br /> by November 15, 2007 and the necessary repairs to the clubhouse roof to repair all water <br /> leaks completed by December 31, 2007, weather permitting. If the entire roof to the <br /> clubhouse needs to be replaced, it shall be replaced by March 15, 2008. To the extent that <br /> Owner can match the color and design of the existing tiles with new tiles and that the <br /> existing tiles are reusable, Owner shall endeavor to reuse as much of the existing roof tile <br /> as possible. New windows shall be installed by June 30, 2008. The healing system shall <br /> be inspected by a licensed mechanical contractor by November 30, 2007 and any <br /> repairs/replacement shall be completed within 90 days. The bathroom shall be upgraded <br /> by May 31, 2008. <br /> 5. The spa shall be repaired/replaced by January 31, 2008. <br /> 6. The electrical unit for the sauna shall be replaced by January 31, 2008. <br /> 7. Specifications for a new irrigation system and landscaping shall be reviewed by the City <br /> by February 28, 2008 and installed by May 31, 2008. Owner shall attempt to retain as <br /> much as possible the existing irrigation system and landscaping that are in place. The <br /> landscaping plan shall include a schedule of work similar to that shown in Exhibit G. City <br /> shall review the scope of the irrigation system and landscaping previously installed to <br /> determine if there is any duplication with the new irrigation system and landscaping. <br /> 8. Laundry room: a new hot water heater shall be installed by November 15. 2007. <br /> aj my docs`mobilhomes`cap impexh d 104) <br /> EXHIBIT E <br />
The URL can be used to link to this page
Your browser does not support the video tag.