Laserfiche WebLink
TFCA Project No. <br /> 3. Project Data: Complete the section below that is most appropriate for your specific project type. Note: Round <br /> trips should be counted as two one-way trips for all project types. <br /> 3A. Carpool Formation/Transit Information Projects: <br /> Project Component #Trips Reduced Per # Days Per Avg. 1-Way Trip <br /> Day(1-Way) Year Distance <br /> 3B. Transit or Rideshare Incentive Projects: <br /> Project Component Total# Total $ #Trips # Days Avg. New Trips Trip Length <br /> Recipients Value of Reduced Per 1-way (1-way)to (1-way) to <br /> Incentives Per Day Year Trip Access Access <br /> Provided (1-way) Distance Transit Transit <br /> 3C. Shuttle/Vanpool Projects: (Report different vehicle types on separate lines) <br /> Vehicle Fuel Total# #of Avg. # Riders Avg. % Trip <br /> Make/Model/ Type Shuttle/ Days/ Shuttle/ per Day Home to Riders Length <br /> Year/Gross Vanpool Year Vanpool (1-way) Work Trip Formerly (1-way)to <br /> Vehicle Trips per Trip Distance Drove Access <br /> Weight Day(1-way) Distance (1-way) Alone Transit <br /> (1-way) <br /> 3D. Smart Growth/Pedestrian Improvement Projects: <br /> Project Data Collection #of Avg. Trip # Pedestrian #Bicycle #Transit <br /> Component Days/Year Distance trips per Day trips per Passenger <br /> _ (1-way) Day trips per Day <br /> Pre-project <br /> Count <br /> 1. -- — <br /> Post-project <br /> Count <br /> Pre-project <br /> Count <br /> 2. , <br /> Post-project <br /> Count <br /> 4. Other Requirements: Attach any other information that is required in the agreement. <br /> Final Report Form 1 - Revised September 2012 Page 2 of 3 <br />