My WebLink
|
Help
|
About
|
Sign Out
TRANSPORTATION COMMISSION RM2 FUND
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
A
>
ALAMEDA COUNTY
>
TRANSPORTATION COMMISSION RM2 FUND
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2013 12:49:37 PM
Creation date
3/7/2013 12:49:33 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
2/27/2013
LONG TERM AGREEMENTS - NAME
CONGESTION MANAGEMENT AGENCY
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Print on Sponsor Letterhea <br /> APPENDIX C <br /> QUARTERLY PROJECT PROGRESS REPORT <br /> SAMPLE FORM <br /> Instructions in Italics <br /> Project Sponsor: Provide name of project sponsor. <br /> Project Title: Provide project title. <br /> Agreement No. Provide agreement number. <br /> Project Description: Provide current project description including limits of work for each facility <br /> involved in project. If no change from agreement or most recent amendment, <br /> provide statement confirming no change. <br /> STATUS: <br /> The status which the project is currently underway and the progress since the last report; major meetings <br /> and decisions on the project; any significant accomplishments; any setbacks to the project. The sponsor <br /> should note whether they anticipate any problems, and what area these problems exist in. <br /> EXPENDITURES TO DATE: <br /> These will be specified as expenditures since the prior reporting, and will include all finding sources <br /> including RM2. These will be sufficient detail to determine that they are eligible expenses. <br /> SCHEDULE CHANGES: <br /> Any changes in the project schedule and the consequences of those changes,particulady related to the <br /> project costs. If the schedule has been modified, a revised schedule must be attached <br /> COST CHANGES: <br /> All changes should be noted in the Progress Report; changes greater than 20%or$2.50,000 dollars, <br /> whichever is less, must be accompanied by a detailed explanation of what options the sponsor has <br /> considered to manage the change, including but not limited to what savings can be realized elsewhere in <br /> the project to compensate for the change, and what the risks are to not funding the change. If costs have <br /> changed by more than $250,000 or 20%whichever is greater, a revised funding plan and cash flow <br /> schedule must be attached. <br /> POTENTIAL CLAIMS: <br /> If R1v12 funds are utilized for the construction phase of the project, then the sponsor mist certify if there <br /> are any Notices of Potential Claim. If they exists, a summary of such notices as well as the likely costs or <br /> schedule impact shall be included. <br /> PROJECT SPECIFIC CONDITIONS: <br /> If the project specific conditions were approved as part of the allocation, the sponsor must address the <br /> status of meeting each condition. <br />
The URL can be used to link to this page
Your browser does not support the video tag.