My WebLink
|
Help
|
About
|
Sign Out
23
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2013
>
061813
>
23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2013 4:41:14 PM
Creation date
6/13/2013 11:22:50 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/18/2013
DESTRUCT DATE
15Y
DOCUMENT NO
23
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Draft Memorandum June 11, 2013 <br /> EPSP Alternatives Infrastructure Cost Burden Review Page 6 <br /> EPS also conservatively assumes that affordable housing and the destination uses do not <br /> contribute to program value. That is, these uses are not valued as part of the infrastructure <br /> feasibility tests. The analysis also assumes that the Operations Service Center and Transfer <br /> Station are relocated except for Alternative 4, opening up additional capacity for new <br /> development2. If these uses are not relocated, either total development would be reduced or <br /> density would need to increase. <br /> Development Cost <br /> EPS relies on preliminary planning-level development cost estimates provided by Kier Wright <br /> Civil Engineers Surveyors. These data are provided as part of the Appendix to this <br /> memorandum. Kier Wright has estimated costs for the on-site planning area, including major <br /> roadway improvements, sewer improvements, water line improvements, and soil mitigation (for <br /> compacted soils, as needed). Additionally, Kier Wright estimated development fees and <br /> connection charges for the development alternatives. This analysis assumes that Alternative 4 <br /> has the same backbone infrastructure costs as Alternative 2 and Alternatives 5 and 6 have the <br /> same backbone infrastructure costs as Alternative 3. Development is assumed to pay applicable <br /> school and park fees and/or dedicate land for these purposes. Any additional park improvement <br /> or school costs would need to come from other sources. <br /> A critical point regarding the infrastructure cost estimates is that all alternatives include costs <br /> associated with the future connection of El Charro Road to Stanley Boulevard, No fee credit to <br /> the traffic fees, regional or local, is assumed for traffic improvements. To the extent that any fee <br /> credit is granted by the City, the feasibility of the EPSP will improve. <br /> The analysis also considers the cost burden associated with development impact fees and other <br /> off-site fees. While these fees are typically paid by vertical builders, the cost in EPSP is <br /> substantial and is therefore considered in this analysis;. Fees include charges on development <br /> from water, wastewater, impervious surface, public facilities, traffic development, Tri-Valley <br /> Transportation Committee, school, park dedication, and GIS fees, as estimated by Kier Wright. <br /> Due to inclusion of park dedication fees, park development costs are excluded from this analysis. <br /> Affordable housing requirements are assumed to be satisfied within the program. <br /> 2 Alternative 4 assumes that the Operations Service Center and Transfer Station remain on the <br /> existing site. <br /> 3 In the subsequent more detailed analysis, the fee cost will net out residual land value that vertical <br /> builders would pay to a horizontal developer. <br /> P:11 21 0 0011210 9 0EastPleasanton\Report\In{restructure Burden Memorandum 4(6.10)1121090_Inrramm061013.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.