Laserfiche WebLink
As a threshold matter,if a proposed project has been the subject of a WSA that <br /> complies with Water Code Section 10910 et seq.,no additional WSA is necessary.4 <br /> The City's 2010 Urban Water Management Plan (UWMP) evaluated the City's 2009 <br /> General Plan (GP). The project area is identified within the GP as a specific plan <br /> area,so the adequacy of this Project's water supplies has been addressed. Thus,in <br /> this document,there will be a consistent reference to the 2010 UWMP and the <br /> analysis and findings within that document. <br /> The City receives the majority of its water supplies from Zone 7 Water Agency. Both <br /> the City of Pleasanton and the Zone 7 2010 UWMPs state that current supplies <br /> cannot support increases in system demands beyond the year 2015. The City's 2010 <br /> UWMP contemplates potable water service to its new and redevelopment areas with <br /> the implementation of conservation programs and use of recycled water to meet <br /> some of the existing potable water irrigation demands.This EPSP WSA assumes the <br /> Project will fully mitigate its water supplies through the implementation of <br /> programs defined in the 2010 UWMP. <br /> °Water Code Section 10910(h). <br /> 2 I EPSP DRAFT WSA July 2013 <br />