Laserfiche WebLink
Section 3. Water Supplies <br /> The City of Pleasanton purchases approximately 80 percent of its water from Zone <br /> 7. The remaining 20 percent is produced from three groundwater wells that are <br /> owned and operated by the City. The groundwater basin is managed by the local <br /> agencies and has limitations on annual pumping. <br /> Zone 7's water supply reliability has decreased in recent years with the biological <br /> opinions on how the state and federal water projects can operate their pumps in the <br /> San Joaquin Delta—the major source of water for Zone 7. The change in operations <br /> has lowered the state's ability to meet its contractual demands and,thus,limited <br /> Zone 7's ability to serve increased water demands. Both Zone 7 and the City assume <br /> little to no growth in potable water demands from the City of Pleasanton over the <br /> next 20 years. <br /> 3.A. Water Supplies Available to the EPSP - Recycled Water <br /> The City has implemented Best Management Practices to help find water supplies <br /> for its various development areas. The WSA (2012) for the City's Housing Element <br /> will help fund the State's required plumbing fixtures retrofit program. <br /> The City recently completed a recycled water feasibility study. The study identified <br /> areas within the City that are viable for use of recycled water. Consistent with the <br /> City's 2010 UWMP, more than 4,000 ac-ft of irrigation demand was identified by the <br /> recycled water feasibility study. Of this,nearly 2,400 ac-ft per year of irrigation was <br /> identified as potential areas for recycled water. See the Figure 6.7 from the <br /> feasibility study done by the City of Pleasanton. The feasibility study figure shows <br /> the areas identified as potential customers for recycled water. As the recycled <br /> water system is expanded,there is an equivalent demand reduction on the potable <br /> water system. This reduction in potable water demand is a source of supply for the <br /> 4 I EPSP DRAFT WSA July 2013 <br />