My WebLink
|
Help
|
About
|
Sign Out
11 ATTACHMENTS 05-07
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2013
>
101513
>
11 ATTACHMENTS 05-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2013 4:38:57 PM
Creation date
10/9/2013 4:26:19 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/15/2013
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 5. Adequacy of Water Supply <br /> Table 5-8 from the City's 2010 UWMP provides a supply and demand comparison <br /> for the City for normal water years;Table 5-9 shows a single dry year;Tables 10a-d <br /> show multiple dry years. Each of the tables shows that the City can meet 100% of <br /> existing and planned supplies in all water year types. <br /> As discussed above,the recycled water feasibility study shows that Phase 1A of the <br /> recycled water system will save the City more than 1,700 ac-ft of potable water a <br /> year. The highest water using land use option for the EPSP area only uses 1,109 af- <br /> yr. When the recycled system is extended to the Hacienda Business Park the <br /> potable water saved would be greater than the entire demand from the ESPS area <br /> under any land use option. <br /> Based on this analysis,there should be a sufficient water supply for the Project and <br /> the City's planned demands during normal,single dry,and multiple dry water years. <br /> 10 I EPSP DRAFT WSA July 2013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.