Draft Memorandum July 25, 2013 <br /> EPSP Infrastructure Feasibility Analysis Page 11 <br /> worth noting that developers' estimates of residential land values at EPSP range between $1.0 <br /> and $1.5 million per acre, below the EPS estimates. <br /> Development Cost <br /> EPS relies on planning-level development cost estimates provided by Kier & Wright Civil <br /> Engineers Surveyors. These data are provided as part of the Appendix A to this memorandum. <br /> Kier & Wright has estimated costs for the on-site planning area, including major roadway <br /> improvements, sewer improvements, water line improvements, and soil mitigation (for <br /> compacted soils, as needed). Additionally, Kier & Wright estimated development fees and <br /> connection charges for the development options. Development is assumed to pay applicable <br /> school and park fees and/or dedicate land for these purposes. Any additional park improvement <br /> or school costs would need to come from other sources. <br /> A critical point regarding the infrastructure cost estimates is that all options include costs <br /> associated with the future connection of El Charro Road to Stanley Boulevard. No fee credit to <br /> the traffic fees, regional or local, is assumed for traffic improvements. To the extent that any fee <br /> credit is granted by the City, the feasibility of the EPSP will improve. <br /> The analysis also considers the cost burden associated with development impact fees and other <br /> off-site fees. Off-site costs are assumed to be incurred by a master developer, while <br /> development impact fees are assumed to be paid by vertical builders in the residual land value <br /> analysis and their impact is reflected in the value estimates. Given the substantial size of the <br /> fees, the cost is also considered as a horizontal cost for the purpose of the cost/value ratio test <br /> and tax burden threshold tests. Fees include charges on development from water, wastewater, <br /> impervious surface, public facilities, traffic development, Tri-Valley Transportation Committee, <br /> school, park dedication, and GIS fees, as estimated by Kier& Wright. Due to inclusion of park <br /> dedication fees, park development costs are excluded from this analysis. Affordable housing <br /> requirements are assumed to be met onsite. <br /> EPS also assumes that the destination uses do not contribute to program value. That is, these <br /> uses are not valued as part of the infrastructure feasibility tests. The analysis also assumes that <br /> the Operations Service Center (OSC) and Transfer Station are relocated except for development <br /> option 4, opening up additional capacity for new development'. While the relocation cost is <br /> unknown, this analysis assumes a cost of$10 million as a "place holder" and does not reflect any <br /> land value that may be internal to the deal. If these uses are not relocated, either total <br /> development would be reduced or density would need to increase. <br /> 7 Option 4 assumes that the Operations Service Center and Transfer Station remain on their existing <br /> sites. <br /> P:1121 0 0 011210 9 0Eas tPIeasanton\Reportpnfrastructure Burden MemorandumU21090Infra mm3_072413.docx <br />