My WebLink
|
Help
|
About
|
Sign Out
11 ATTACHMENTS 05-07
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2013
>
101513
>
11 ATTACHMENTS 05-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2013 4:38:57 PM
Creation date
10/9/2013 4:26:19 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/15/2013
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
This Appendix includes the analysis of Option 7. This is an additional development alternative <br /> prepared based on discussion with City staff and the developers based on the previously <br /> prepared Option 5. It reflects the residential product types discussed at the June 19th Taskforce <br /> Meeting. <br /> Table B-1 Option 7 Land Value Feasibility Test <br /> Item EPSP Option 7 <br /> Infrastructure Costs(rounded) <br /> Backbone Infrastructure $61,138,000 <br /> Off-Site Improvements $5,000,000 <br /> Potential Relocation of OSC and TS $10,000,000 <br /> Predevelopment/Developer Return $19,034,500 <br /> Total Infrastructure Cost Burden $95,172,500 <br /> Improved Residual Land Value $244,270,372 <br /> Raw Land Value $149,097,872 <br /> Land Value(per acre) $367,236 <br /> P:\1210001 121090EastPleasan lon\Beportunfraslrucfure Burden MemorandunBI21090 Infra mm3 o7 41 docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.