Laserfiche WebLink
Table C-1 <br /> Custom Lot New Single Family Residual Land Value <br /> East Pleasanton Specific Plan Infrastructure Feasibility Analysis; EPS#121090 <br /> Item Assumption Per Unit Total(per acre) <br /> DEVELOPMENT PROGRAM <br /> Units 4 <br /> Gross Area 5,000 sq.k.per unit 20,000 sq.ft. <br /> Efficiency Ratio 100% <br /> Net Area 20,000 sq.ft. <br /> Parking Ratio(spaces per unit) 2.0 <br /> REVENUE ASSUMPTIONS <br /> Sale Price $1,400,000 per unit $1,400,000 $5,600,000 <br /> Options(net above costs) 1.0% $14,000 $56,000 <br /> (less)Cost of Sale a0% f$42 0001 ($168,000). <br /> Total Revenue $1,372,000 $5,488,000 <br /> DEVELOPMENT COSTS <br /> Direct Costs <br /> Building Construction Cost(1) $115 /GLA sq.ft. $575,000 $2,300,000 <br /> Site Improvement Cost $7.00 /land sq.ft. $76,230 $304,920 <br /> Parking Construction Cost $0 per space <br /> Total Direct Costs $651,230 $2,604,920 <br /> Indirect Costs <br /> Impact Fees <br /> Water $25,120 per unit $25,120 $100,480 <br /> Wastewater $14,881 per unit $14,881 $59,524 <br /> Public Facilities $4,487 per unit $4,487 $17,948 <br /> Traffic Development $4,465 per unit $4,465 $17,860 <br /> Tri-Valley Transportation Committee Fee $2,279 per unit $2,279 $9,116 <br /> Impervious Surface $7,623 per unit $7,623 $30,492 <br /> In-lieu Park Dedication Fee $9,707 per unit $9,707 $38,828 <br /> GIS Fee $22 per unit $22 $87 <br /> School Impact Fee $33,700 per unit $33,700 $134,800 <br /> Other Indirect Costs(2) 20.0% of direct costs $130,246 $520,984 <br /> Total Indirect Costs 35.7% of direct costs $232,530 $930,119 <br /> Subtotal,Direct and Indirect Costs $883,760 $3,535,039 <br /> Contingency(%of direct and indirect costs) 5.0% of direct and indirect costs $44,188 $176,752 <br /> Developer Return(%of direct and indirect costs) 14.0% of direct and indirect costs $123,726 $494,905 <br /> Total Costs $1,051,674 $4,206,697 <br /> RESIDUAL LAND VALUE $320,000 $1,281,000 <br /> (1)Includes building permits. <br /> (2)Include architecture Si engineering,financing,and G&A costs. <br /> Source:Economic Si Planning Systems,Inc. <br /> Economics Planning Systems,Inc. 7/2512013 P 112100 0t121090Ea#Peasantamoatallnnesuvvure FeasbiFtylFeast ility Oak's 722.13 <br />