Laserfiche WebLink
Table C-3 <br /> Duplexes Residual Land Value <br /> East Pleasanton Specific Plan Infrastructure Feasibility Analysis; EPS#121090 <br /> Item Assumption Per Unit Total(per acre) <br /> DEVELOPMENT PROGRAM <br /> Units 11 <br /> Gross Area 2,500 sq.ft.per unit 27,500 sq.ft. <br /> Efficiency Ratio 100% <br /> Net Area 27,500 sq.ft. <br /> Parking Ratio(spaces per unit) 2.0 <br /> REVENUE ASSUMPTIONS <br /> Sale Price $800,000 per unit $800,000 $8,800,000 <br /> Options(net above costs) 1.0% $8,000 $88,000 <br /> (less)Cost of Sale 3.0% ($24.000). ($264,000) <br /> Total Revenue $784,000 $8,624,000 <br /> DEVELOPMENT COSTS <br /> Direct Costs <br /> Building Construction Cost(1) $110 /GLA sq.ft. $275,000 $3,025,000 <br /> Site Improvement Cost $16.50 /land sq.ft. $65,340 $718,740 <br /> Parking Construction Cost $0 per space <br /> Total Direct Costs $340,340 $3,743,740 <br /> Indirect Costs <br /> Impact Fees <br /> Water $25,120 per unit $25,120 $276,320 <br /> Wastewater $14,881 per unit $14,881 $163,691 <br /> Public Facilities $3,351 per unit $3,351 $36,861 <br /> Traffic Development $4,465 per unit $4,465 $49,115 <br /> Tri-Valley Transportation Committee Fee $2,279 per unit $2,279 $25,069 <br /> Impervious Surface $3,168 per unit $3,168 $34,848 <br /> In-lieu Park Dedication Fee $9,707 per unit $9,707 $106,777 <br /> GIS Fee $8 per unit $8 $87 <br /> School Impact Fee $16,850 per unit $16,850 $185,350 <br /> Other Indirect Costs(2) 20.0% of direct costs $68,068 $748 748 <br /> Total Indirect Costs 43.5% of direct costs $147,897 $1,626,866 <br /> Subtotal,Direct and Indirect Costs $488,237 $5,370,606 <br /> Contingency(%of direct and indirect costs) 5.0% of direct and indirect costs $24,412 $268,530 <br /> Developer Return(%of direct and indirect costs) 14.0% of direct and indirect costs $68,353 $751,885 <br /> Total Costs $581,002 $6,391,021 <br /> RESIDUAL LAND VALUE $203,000 $2,233,000 <br /> (1)Includes building permits. <br /> (2)Include architecture 8 engineering,financing,and G 8 A costs. <br /> Source:Economic 8 Planning Systems,Inc. <br /> Economic&Planning Systems.Inc 7/25/2013 P11210.001121090En Pleasantonloatavnhasln,cture FeasibiNfy,Feasibility Calcs 7 22.13:Is: <br />