Laserfiche WebLink
EXHIBIT B <br /> PREDEVELOPMENT BUDGET <br /> Expenditures to be <br /> Reimbursed to <br /> Budgeted Amount BRIDGE <br /> City Fees <br /> Traffic study 5,500 5,500 <br /> Architectural peer review 3,000 3,000 <br /> Application fee 2,025 2,025 <br /> Noise Study 4,023 4,023 <br /> Plan Check Fees 33,717 <br /> Architecture& Design <br /> Miscellaneous design consultants 27,000 <br /> Civil Engineering 36,100 20,735 <br /> Steinberg: Schematics 58,123 56,764 <br /> Steinberg: Design Development 93,891 <br /> Steinberg: Construction Drawings 223,550 <br /> Steinberg:Value Engineering 13,413 <br /> Survey&Geotechnical Engineer 13,600 7,467 <br /> Reimburseable expenses&Add'I Services 35,000 <br /> Loan Fees &Other Lender Charges <br /> Appraisal Fees 22,000 8,500 <br /> Market Study& Updates 14,500 14,500 <br /> Marketing Consultant 22,000 <br /> Phase 1&2 13,000 <br /> Loan Application Fees" 197,363 <br /> Legal 82,000 16,061 <br /> Contingency 50,000 <br /> Total Predevelopment Expenses 949,805 138,575 <br /> Amount Previously Reimbursed to BRIDGE (27,496) <br /> Remaining Amount to be Reimbursed 111,079 <br /> " If CHFA provides financing, they require that half of the 2%loan fee be <br /> paid prior to their Board's approval of the loan. <br />