My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2013
>
110513
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2016 2:57:42 PM
Creation date
10/31/2013 12:02:08 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/5/2013
DESTRUCT DATE
15Y
DOCUMENT NO
04
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• (5) Creation of Job Opportunities . The <br /> development of the Project will provide a significant <br /> number of construction jobs and permanent employment <br /> opportunities for the residents of Pleasanton and the <br /> Tri-Valley. On balance these will be skilled jobs which <br /> will be compatible with the present and future workforce <br /> of Plcaoanton. <br /> E . Developer and Prudential have committed over <br /> Thirty-Two Million Dollars ($32,000,000.00) in the construc- <br /> tion of certain improvements ("Public Improvements") located <br /> within the vicinity of the Property including, but not <br /> limited to the following: <br /> (1) Off-Site Street Improvements . <br /> (a) Hopyard Road, Arroyo Mocho Bridge, <br /> Owens Drive Intersection and Owens Court . The <br /> improvements include: (i) widening of Hopyard Road <br /> to six through lanes with dual left turn lanes and <br /> right hand turn lanca from Owens Drive to Valley <br /> Avenue, (ii) construction of a northbound lanes <br /> bridge over the Arroyo Mocho, (iii) widening and <br /> realignment of Owens Drive (formerly Johnson Drive) <br /> east and west of Hopyard Road, (iv) realignment of <br /> Owens Court, (v) undergrounding of utilities and <br /> (vi) installation of extensive landscaping, side- <br /> walks, street lighting, bus turnouts and shelters <br /> and signalization of all intersections. <br /> 5. <br />
The URL can be used to link to this page
Your browser does not support the video tag.