Laserfiche WebLink
Attachment 4 <br /> volume of customers needing assistance to find this information. Further investigation of <br /> possible ways to make this information readily available to customers is needed. <br /> • New Temporary Staffing: The entry into mandatory conservation will result in: <br /> o Increased community interest/requests for water conservation program support; <br /> o Additional utility billing monitory for customer compliance; <br /> o Depending upon severity of water restriction, monitoring business <br /> areas/neighborhoods for water waste violations; <br /> o Increased need for turf monitoring at parks and meter checks <br /> Therefore, the following temporary staffing arrangements could be necessary to ensure <br /> adequate coverage of duties: <br /> • Temporary, full-time incorporation of water-efficiency technician into <br /> Water Conservation Division <br /> • Two part-time, new temporary staff to Parks Maintenance Division to <br /> cover time increased turf monitoring and/or hand watering <br /> • If mandatory rationing becomes necessary, how to enforce the reduction <br /> will most likely require additional staff or reassignment of current staff <br /> • Construction/Cleaning: Now requiring water used for construction to come from a recycled <br /> water source. Investigate the possibility of requiring street sweeping to do so as well. <br /> Actions to Protect the Long-Term.Water Supply Needs of the Pleasanton <br /> Community <br /> California's Department of Water Resources accepts scientific modeling of climate projections <br /> that estimate the trend in decreased precipitation in the Sierra-Nevada Mountain Range to <br /> continue through the 21st century, and beyond. Current conservative models estimate the snow <br /> pack to be reduced between 25-40% by 2050. In addition to climate change effects, legal and <br /> environmental issues surrounding the Sacramento-San Joaquin Delta continue to threaten the <br /> reliability of Pleasanton's water supply. Community acceptance of eliminating water waste as a <br /> way of life, and the reduced dependence upon State Water Project water are necessary for the <br /> Pleasanton community to experience fewer disruptions during future limited water supply years. <br /> Recycled Water <br /> Recycled water was identified as a significant and possible alternate water supply with the <br /> capability of replacing potable (drinking) water in the irrigation of large landscapes in the City.. <br /> This alternate and safe irrigation water supply is drought proof; therefore, insuring past capital <br /> investments in landscaping/sports fields can continue to receive water even in dry years. In <br /> light of the State's current need to reduce California's dependency on State Water Project <br /> supply, the State Water Resources Control Board (SWRCB) is closely considering streamlining <br /> grant processing and providing very low interest rate loans to move recycled water projects <br /> forward. <br /> City of Pleasanton I City Wide Drought Action Strategies 5 <br />