My WebLink
|
Help
|
About
|
Sign Out
22
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2014
>
071514
>
22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2015 4:32:05 PM
Creation date
7/9/2014 1:59:38 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
7/15/2014
DESTRUCT DATE
15Y
DOCUMENT NO
22
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
—7— AB 2188 <br /> 1 application to install a solar energy system shall be limited to the <br /> 2 building official's review of whether,it meets all health and safety <br /> 3 requirements of local, state, and federal law. The requirements of <br /> 4 local law shall be limited to those standards and regulations <br /> 5 necessary to ensure that the solar energy system will not have a <br /> 6 specific,adverse impact upon the public health or safety. However, <br /> 7 if the building official of the city or county makes a finding, based <br /> 8 on substantial evidence, that the solar energy system could have <br /> 9 a specific, adverse impact upon the public health and safety, the <br /> 10 city or county may require the applicant to apply for a use permit. <br /> 11 (c) A city, county, or city and county may not deny an <br /> 12 application for a use permit to install a solar energy system unless <br /> 13 it makes written findings based upon substantial evidence in the <br /> 14 record that the proposed installation would have a specific,adverse <br /> 15 impact upon the public health or safety, and there is no feasible <br /> 16 method to satisfactorily mitigate or avoid the specific, adverse <br /> 17 impact. The findings shall include the basis for the rejection of <br /> 18 potential feasible alternatives of preventing the adverse impact. <br /> 19 (d) The decision of the building official pursuant to subdivisions <br /> 20 (b) and (c) may be appealed to the planning commission of the <br /> 21 city, county, or city and county. <br /> 22 (e) Any conditions imposed on an application to install a solar <br /> 23 energy system shall be designed to mitigate the specific, adverse <br /> 24 impact upon the public health and safety at the lowest cost possible. <br /> 25 (f) (1) A solar energy system shall meet applicable health and <br /> 26 safety standards and requirements imposed by state and local <br /> 27 permitting authorities. <br /> 28 (2) Every solar energy system for heating water shall be certified <br /> 29 by an accredited listing agency. <br /> 30 (3) A solar energy system for producing electricity shall meet <br /> 31 all applicable safety and performance standards established by the <br /> 32 National Electrical Code,the Institute of Electrical and Electronics <br /> 33 Engineers,and accredited testing laboratories such as Underwriters <br /> 34 Laboratories and, where applicable, rules of the Public Utilities <br /> 35 Commission regarding safety and reliability. <br /> 36 (g) (1) On or before September 30, 2015, every city, county, <br /> 37 or city and county, in consultation with the local fire department <br /> 38 or district and the utility director, if the city, county, or city and <br /> 39 county operates a utility, shall adopt an ordinance,consistent with <br /> 40 the goals and intent of subdivision (a), that creates an expedited, <br /> 94 <br />
The URL can be used to link to this page
Your browser does not support the video tag.