Laserfiche WebLink
AB 2188 Assembly Bill-Bill Analysis Page 4 of 7 <br /> addressed if solar electricity generation is going to help <br /> the state address its growing energy needs. Research <br /> indicates that while the hard costs of solar, namely <br /> materials and components, have come down in price in recent <br /> years, soft costs, including the cost of local agency <br /> permitting and inspection process, are preventing solar <br /> energy systems from being more affordable to many <br /> Californians. The Governor's Office of Planning and <br /> Research has called for streamlining the permit process, <br /> including the development a checklist with expedited review <br /> as a best practice to continue to promote these systems. <br /> AB 2188 directs each city and county to adopt an ordinance <br /> tailored to the unique needs of their communities, to adopt <br /> best practices in the permit application, review and <br /> inspection process, to reduce costs, and promote solar <br /> electricity generation. <br /> 2. Home rule . Solar industry officials report that in <br /> recent years cities and counties have become more familiar <br /> with roof top solar electricity generation systems and that <br /> awareness, along with increased uniformity of those <br /> systems, has led to dramatic reductions in permit <br /> processing and inspection times. Over time, more cities <br /> and counties will adopt best practices based on the needs <br /> and experiences of their communities. Those cities and <br /> counties that process hundreds of permits each year, and <br /> which are familiar with solar electricity generations <br /> systems, will realize efficiencies. For them, adopting a <br /> best practice ordinance can make sense. But for those <br /> local agencies that have yet to receive an application for <br /> a rooftop solar generation system, or process very few <br /> permit requests, it does not make sense to require them to <br /> develop a checklist and ordinance when they know little <br /> about these systems and demand for solar permits is low. <br /> The Committee may wish to consider whether the state should <br /> mandate a solar permit ordinance for local agencies who are <br /> fully empowered to adopt best practices on their own. <br /> 3. Inspectors and inspections . AB 2188 prohibits cities <br /> and counties from requiring more than one inspection to <br /> review a permitted solar energy project that meets the <br /> requirements for expedited review. Inspections must be <br /> scheduled within five days of a request to inspect. Five <br /> days may not give cities and counties enough time to <br /> schedule all inspections, and it is unclear if all cities <br /> and counties can consolidate structural, engineering and <br /> AB 2188 -- 6/18/14 -- Page 6 <br /> fire safety reviews into a single inspection. The <br /> Committee may wish to consider amending the bill to ensure <br /> there is sufficient time and opportunity for cities and <br /> counties to ensure that rooftop solar generation systems <br /> meet health and safety requirements through adequate <br /> inspections. <br /> 4. Clarity in order . AB 2188 requires each city and <br /> county to adopt an ordinance and establish a checklist and <br /> states that applications that meet the requirements of the <br /> checklist shall be approved. It is not clear that all <br /> required elements of review can be reflected in a <br /> checklist. In contrast, the ordinance adopted in response <br /> to AB 2188 can and should reflect all applicable <br /> requirements to approve a solar electricity generation <br /> system. The Committee may wish to consider amendments <br /> stating that permits shall be issued upon confirmation that <br /> the application is consistent with all requirements of the <br /> checklist or the ordinance, as determined by the local <br /> http://www.eginfo.ca.gov/pub/13-14/bi l Vasm/ab_2151-2200/ab_2188_c fa_20140620_155953_sen_comm.hlm l 7R/2014 <br />