My WebLink
|
Help
|
About
|
Sign Out
22
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
061615
>
22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2015 11:53:30 AM
Creation date
6/11/2015 12:21:04 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/16/2015
DESTRUCT DATE
15Y
DOCUMENT NO
22
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
new development in Pleasanton. Construction will not be allowed to start until the terms <br /> of this program and/or funds have been approved by the City. <br /> o Landscaping <br /> A preliminary landscape plan has been provided for the project, including enlargements <br /> of the design for the common open space/recreation areas, additional planting and the <br /> precast concrete wall all along the southern property line. Although the landscape plans <br /> are conceptual, staff believes that the species, quantities, and sizes of the proposed <br /> landscaping for the site is consistent with the Standards and Hacienda Guidelines and <br /> is generally appropriate. <br /> The City is in the design and construction process of bringing recycled water to <br /> Hacienda Business Park, and the project will be conditioned to use recycled water for <br /> landscape irrigation when it becomes available. Some of the proposed species, such <br /> as Celtis sinensis, Gingko biloba, Pistacia chinensis, etc. are salt-sensitive, and are not <br /> suitable for recycled water irrigation. Staff has included conditions requiring plant <br /> species be changed to only include recycled water tolerant plants and that the planting <br /> meet the State Water Efficient Landscape Ordinance and Bay Friendly Basics <br /> requirements. <br /> A condition of approval has been added requiring detailed landscape and irrigation <br /> plans be provided at the building permit stage subject to the review and approval by the <br /> Director of Community Development. <br /> o Tree Removal <br /> The Existing Trees Disposition Plan (Sheet C2.0 of Exhibit B) shows that tree Nos. 91, <br /> 92, 95 and 99, would be removed. These trees are heritage-sized trees located in the <br /> berm area along the front of the project site and were noted to be "Preserved" by the <br /> tree report prepared for the prior apartment development. In addition, the latest review <br /> by the project arborist, HortScience, indicates that tree No. 97, another heritage-sized <br /> tree, would be removed. The additional tree removal is based on the following analysis <br /> prepared by the arborist: <br /> Evergreen ash #91, 92, 95, 97 and 99 would be removed rather than preserved. All 5 trees meet the <br /> City's criteria for Heritage status. These 5 trees are now within or immediately adjacent to the <br /> pedestrian access routes to the townhomes. RJA, the project's civil engineer, informs me that access <br /> routes cannot feasibly be shifted to avoid the trees given the location of utilities and <br /> existing berms. <br /> Staff has reviewed the arborist's recommendation with the proposed plans. Tree Nos. <br /> 91, 92, 95, and 97 may interfere with the proposed development. Tree No. 99 may be <br /> preserved. Staff has included a condition requiring that an updated arborist report re- <br /> evaluating the trees impacts be submitted at the building permit plan check stage based <br /> on the construction plans. <br /> Summerhill Housing Group Planning Commission <br /> Page 18 of 28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.