Laserfiche WebLink
CHAPTER 4 4.6 TRAFFIC AND CIRCULATION <br /> 4.6 TRAFFIC AND CIRCULATION <br /> This chapter summarizes the findings of traffic studies that were completed for the proposed project by <br /> Dowling Associates,Inc.,TJKM Transportation Consultants,and Fchr&Peers.The first traffic analysis <br /> was prepared by Dowling Associates,Inc.in August 2006.Subsequent to completion of this report,the <br /> Pleasanton General Plan was updated(City of Pleasanton,2009),the cumulative development scenario <br /> changed,and the proposed project was reduced in size.To reflect these new conditions,TJKM completed <br /> a new traffic analysis in September 2011.This report was peer reviewed by Fehr&Peas in February <br /> 2012,and then Fehr&Peers updated the TJKM report with an expanded impact analysis in June 2012. <br /> The June 2012 report addressed some access alternatives,but Fchr&Peers then further expanded their <br /> alternatives analysis in August 2012.The earlier 2006 Dowling,2011 TJKM,and February 2012 Fehr& <br /> Peers reports are on file at the Pleasanton Planning Division of the Community Development Department <br /> at 200 Old Bernal Avenue in Pleasanton.The June and August 2012 Fehr&Peers reports are included in <br /> Appendix C.This section summarizes the results of the Fehr&Peers analyses related to the proposed <br /> project's sole access connection on Lund Ranch Road(Fehr&Peers,2012a).The results of Fehr& <br /> Pccrs' analysis of alternative access options are included in Chapter 5,Alternatives. <br /> 4.6.1 ENVIRONMENTAL SETTING <br /> ROADWAY NETWORK <br /> Figure 4.6-1 presents a map of the roadway system in the vicinity of the site.Regional access to the <br /> project site is provided by the Interstate 680 freeway(1-680),Sunol Boulevard,and Bernal Avenue. Local <br /> access to the site is provided by Independence Drive,Junipero Street,and Lund Ranch Road.A <br /> discussion of these roadway facilities is provided below: <br /> Sunol Boulevard is a three-lane arterial south of the Sycamore Road. It is a two-lane roadway with raised <br /> median and a speed limit of 35-40 mph between Sycamore Road and Bernal Avenue.North of Bernal <br /> Avenue it is a three-lane roadway with a two-way turn lane and a speed limit of 25 mph. <br /> Bernal Avenue is a two-lane arterial with raised median and a speed limit of 35 mph south of <br /> Independence Avenue.There is • n north of Independence Avenue. <br /> Junipero Street is a two-Ian ocal collector met t t provides access from the project site to Sunol <br /> Boulevard.The speed limit on this roa is 25 mph. <br /> Independence Drive is a north-south roadway located northwest of the project site.It is a three-lane <br /> roadway with a two-way left-turn lane and a speed limit of 30 mph north of Independence Court.South of <br /> Independence Court,it is a two-lane roadway with a speed limit of 25 mph.This roadway provides access <br /> from the project site to Bernal Avenue. <br /> Lund Rand,Road is a two-lane residential street with a speed limit of 25 mph,and it is the only road that <br /> is proposed to provide project residents with access to Junipero Street and Independence Drive. <br /> Lt ND ItANCII II PUD EAR 4.6-1 JULY 2014 <br />