Laserfiche WebLink
Ventana Hills Steering Committee <br /> c/o Lofland <br /> Pleasanton, CA 94566 <br /> June 23, 2015 <br /> Planning Commissioners <br /> City of Pleasanton <br /> Subject: Item 6.a., PUD-25, Lund Ranch II - Planning Commission, June 24, 2015 <br /> After reviewing the Staff Report for the above subject item, the Ventana Hills Steering <br /> Committee makes the following comments; <br /> VI. KEY PROJECT ISSUES, Measure PP Questions, #4. Roads are Structures/Roads <br /> are not Structures, page 15 of 40; <br /> Measure PP was not intended to include roads as clarified by the proponents of <br /> ®Measure PP prior to the vote of residents in November 2008. For more clarification, <br /> please see our letter dated February 24, 2015 (attached). <br /> VII. PLANNING COMMISSION OPTIONS 3. Approve a revised project that divides the <br /> project into two separate areas, each accessed through a different neighborhood, <br /> pages 34 & 35 of 40 <br /> As clarification to a Sunset Creek Lane connection - We believe the Planning <br /> Commission, like Council and Staff, will have the alternative of use retaining walls on <br /> the Sunset Creek Lane extension and, therefore, can create a road that fits with the <br /> topography, saving many trees and much cost. Since the use of retaining walls in the <br /> creek bed is being allowed, their use in a biologically less sensitive area should also be <br /> allowed to help save trees. <br /> Regarding the creek crossing and bridge abutments - As mentioned in our letter of <br /> February 24, 2015, item 3 (attached), these would have either non-existent wetland <br /> impact, or only several sq. ft. of impact which pales in comparison to the wetland <br /> impact of the proposed lot layout, which backs up lots over the creek channel for most <br /> of its length, literally relocating the creek channel for 243 feet, with hundreds of lineal <br /> feet of retaining walls backed up to, and over the former creek bed. <br />