Laserfiche WebLink
Community Development Department, Public Works/Engineering section at City <br /> offices, Alameda County Clean Water Program, State Water Board, and at the <br /> following websites: <br /> http://www.waterboards.ca.gov/sanfranciscobav/water issues/programs/stormwate <br /> r/Municipal/index.shtml; <br /> and <br /> http://www.waterboards.ca.gov/sanfranciscobav/board info/agendas/2007/march/a <br /> la m ed a%20fi na I%20ord a r%20 r2-2007-0025.pdf <br /> The project shall comply with the "Construction General Permit" as required by the <br /> San Francisco Bay Regional Water Quality Control Board: <br /> (http://www.waterboards.ca.gov/water_issues/programs/stormwater/construction.s <br /> html) <br /> A. Design Requirements <br /> 1. The NPDES Permit design requirements include, but are not limited to, the <br /> following: <br /> a) Source control, sight design measures, and design and implementation of <br /> stormwater treatment measures are required when commercial, industrial <br /> or residential development creates and replaces 10,000 square feet or <br /> more of impervious surface, including roof area, streets and sidewalk. <br /> b) Hydro-modification standards are required when a new development or <br /> redevelopment project creates and replaces total impervious area of one <br /> acre or more. <br /> c) The NPDES Permit requires a proactive Diazinon pollutant reduction plan <br /> (aka Pesticide Plan) to reduce or substitute pesticide use with less toxic <br /> alternatives. <br /> d) The NPDES Permit requires complying with the Copper Pollutant <br /> Reduction Plan and the Mercury Pollutant Reduction Plan. <br /> 2. The following requirements shall be incorporated into the project: <br /> a) The project developer shall submit a final grading and drainage plan <br /> prepared by a licensed civil engineer depicting all final grades and on-site <br /> drainage control measures including bio-swales. Irrigated bio-swales shall <br /> Page 12 of 17 <br />