My WebLink
|
Help
|
About
|
Sign Out
22
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2016
>
100416
>
22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2016 2:23:44 PM
Creation date
9/29/2016 2:50:37 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/4/2016
DESTRUCT DATE
15Y
DOCUMENT NO
21
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ESA Memo to City of Pleasanton:June 13,2016 <br /> importance of renewable costs and demonstrates how high renewable costs can all but eliminate <br /> any price advantage of the CCA over PG&E.As such,these costs represent a significant risk for the <br /> Alameda CCA. <br /> Certainly the balance of wholesale renewable power purchases and the development of local <br /> renewable energy projects has impacts on the CCA power costs as well as on the economic <br /> development of the county. Purchasing renewable power resources from within the State,but <br /> outside of Alameda County,can be carried out at a relatively low cost. As mentioned above,local <br /> municipal utilities have as recently as May 2016 purchased solar power from large utility scale <br /> projects for approximately 4 cents a kWh. However,building local solar and wind generation in the <br /> Bay Area is considerably more expensive. For example,the City of Palo Alto's CLEAN (Clean Local <br /> Energy Accessible Now)program offers to purchase locally generated solar power at 16.5 cents per <br /> kWh for a 20 year term. The Study of the Alameda CCA assumes a 15%premium for renewable <br /> energy costs for projects in Alameda County. We are concerned that this premium underestimates <br /> the costs of renewable power development. Certainly,areas of eastern Alameda County could serve <br /> as sites for solar or wind power but we are unable to verify that a 15%premium is sufficient in <br /> estimating the costs of such projects. In a high renewable cost scenario,the development of local <br /> renewables within Alameda County will lag,unless the CCA is able to increase its rates to attract <br /> developers. <br /> Comments on Sensitivity Analysis <br /> The sensitivity analysis presented in the Study highlights the key risks faced by the Alameda CCA. <br /> These risks are: low power prices offered by PG&E,future high renewable prices and costs,and <br /> PCIA charges. Of these three risks,we expect that short-term high renewable prices and PCIA <br /> charges will have the most significant risks on the Alameda CCA rate structure and balance sheet. <br /> In addition to these key risks,we believe that hydro variability and its impact with energy prices <br /> are significant risks that are not fully explored in the Study. These risks are discussed above. <br /> As a result,we recommend that additional modeling work be carried out on these three key risks <br /> and their impacts on Alameda CCA's balance sheet and reserve requirements. <br /> 4. Alignment of the CCA with the City's Energy and Climate Goals <br /> The City of Pleasanton has long been interested in energy independence.In the City of Pleasanton <br /> 2002 Energy Plan,CCA was identified as a potential means of accomplishing that independence. <br /> The City first investigated the feasibility of implementing CCA locally in 2005,when it participated <br /> in a research study by the California Energy Commission Public Interest Energy Research(PIER), <br /> which found"that if the City was willing to finance renewable energy development, 50%renewable <br /> energy generation could be achieved at no increased cost to the ratepayers."Also in 2005,the City <br /> added an Energy Element to its General Plan,which points to a CCA as a prospective means of <br /> gaining more local control over the City's energy supply portfolio and electricity rates,and includes <br /> the goal to move toward"a sustainable future that increases renewable energy use,energy <br /> conservation,energy efficiency,energy self-sufficiency,and limits energy-related financial burdens <br /> in Pleasanton."The City has incorporated this goal,and consideration of CCA,into its 2010 Energy <br /> Efficiency and Conservation Strategy(EECS)and its 2012 Climate Action Plan(CAP). <br /> The EECS includes a chapter on Community Choice Aggregation,which specifically recommends <br /> monitoring neighboring CCA programs in Mann County and San Francisco and to identify potential <br /> models for a successful CCA,and to engage with other East Bay cities to explore the viability of <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.