Laserfiche WebLink
Urban Stormwater Conditions <br /> The project shall comply with the NPDES Permit No CAS612008, dated November 19, 2015, <br /> and amendments, issued the by California Regional Water Quality Control Board, San <br /> Francisco Bay Region, a copy of which is available at the Community Development Department, <br /> Public Works/Engineering section at City offices, Alameda County Clean Water Program and at <br /> State Water Board <br /> (http //www waterboards ca gov/sanfranciscobay/water issues/programs/stormwater/Municipal/i <br /> ndex shtml , <br />'i The project shall comply with the "Construction General Permit" as required by the San <br /> Francisco Bay Regional Water Quality Control Board <br /> (http //www waterboards ca gov/water issues/programs/stormwater/construction shtml) <br /> A. Design Requirements <br /> 1 The NPDES Permit design requirements include, but are not limited to, the following <br /> a Source control, sight design measures, and design and implementation of stormwater <br /> treatment measures are required when commercial, industrial or residential <br /> development creates and replaces 10,000 square feet or more of impervious surface, <br /> including roof area, streets and sidewalk <br /> b Hydro-modification standards are required when a new development or <br /> redevelopment project creates and replaces total impervious area of one acre or <br /> more <br /> c The NPDES Permit requires a proactive Diazinon pollutant reduction plan (aka <br /> Pesticide Plan) to reduce or substitute pesticide use with less toxic alternatives <br /> d The NPDES Permit requires complying with the Copper Pollutant Reduction Plan and <br /> the Mercury Pollutant Reduction Plan <br /> 2 The following requirements shall be incorporated into the project <br /> a The project developer shall submit a final grading and drainage plan prepared by a <br /> licensed civil engineer depicting all final grades and on-site drainage control <br /> measures including bioswales Irrigated bioswales shall be redesigned as needed to <br /> the satisfaction of the City Engineer to optimize the amount of the stormwater running <br /> off the paved surface that enters the bioswale at its most upstream end This plan <br /> shall be subject to the review and approval of the City Engineer prior to the issuance <br /> of any building permits <br /> b The project developer shall submit sizing design criteria to treat stormwater runoff and <br /> for hydromodification, if required, at the time of PUD plan submittal and an updated <br /> detailed copy of calculations with subsequent submittals <br /> c Landscaping shall be designed to minimize irrigation and runoff, promote surface <br /> infiltration where appropriate and acceptable to the project soils engineer, and <br /> PUD-110, Irby Ranch City Council <br /> Page 27 of 31 <br />