Development Fees:
<br />Development fees are assessed on all new structures, additions to existing structures and new
<br />residential units. Development Fees are based on the fee in effect at the time of payment, usually at
<br />the Building Permit Issuance. Pre - payment of building permit fees and impact fees before permit
<br />issuance is not permitted.
<br />Any change of use on a parcel triggers a review of the sewer capacity (both DSRSD and City) and
<br />traffic impacts to determine if this creates an increase in demand on the City infrastructure. In all
<br />cases where it is determined that the new use increases demand, a fee is assessed based on the
<br />difference between the previously purchased impact fee or capacity at a space, building or parcel
<br />and the increased impact or capacity demand.
<br />Impervious Surface Drainage Fee (P party fee collected for the Alameda County Flood Control & Water
<br />Conservation District, Zone 7)
<br />Zone 7 Drainage District fees are collected for all newly constructed impervious area, and are
<br />based on the total square footage increase of all impervious surfaces on the lot or site. Drainage
<br />Fees are only payable at time of permit issuance, and are based upon the rate in effect at the
<br />time of payment, not application date.
<br />Note: Impervious is defined by the Zone 7 Drainage District as any area occupied by buildings or
<br />structures, driveways, streets, sidewalks, parking, storage or any other area where surfacing is
<br />required, and any other surface including, but not limited to, asphalt, concrete, compacted gravel, or
<br />other nor - porous or semi - porous substance or substances which will cause, assist, or in any way
<br />contribute to the runoff in any appreciable amount or quantity of water or any associated liquid
<br />elements.
<br />$1.00 per sq ft of impervious surface (effective 01/01/11)
<br />Water Connection Fees
<br />The connection fees for potable water services are based on the size of the water meter(s) and
<br />the rate in effect at the time of payment, not application date. The project designer determines
<br />the size and number of meters needed for the project. The Building and Safety Division collects
<br />water connection fees for one- and two- family residential domestic meters. The Engineering
<br />Division collects water connection fees for all other projects.
<br />Note: Single - family and duplex housing units with fire sprinkler systems on a combined domestic and fire
<br />service connection (up to a maximum 1 " meter size) may pay the Zone 7 connection charge based on the
<br />5/8" meter size. City connection and meter charges are based on the meter size without any reduction. No
<br />water connection fee is collected for separate private fire service connections.
<br />eff 1101116
<br />3rd party fee collected by the City of Pleasanton for the Zone 7 Water District.
<br />" In the North Pleasanton Improvement District (designated undeveloped parcels within the Hacienda Business Park
<br />& Stoneridge Mall Area) the City Potable Water connection fee is reduced by approximately 61 %.
<br />*"Connection fee, meter type and availability of water meters larger than 2" must be verified prior to payment.
<br />Check with the Engineering Department for areas where Recycled Water (Non - Potable) Service is available.
<br />5
<br />Recycled Water Potable Water Connection Fees
<br />Meter Meter Gallons Meter Connection Fee (both fees applicable)
<br />Size Type per Min Fee City Only City- Zone 7•
<br />518' x' Displacement 10 $420 $14,889 $1,200 $2 320
<br />' /," Displacement 15 $470 $22,334 $1,800 $37,980
<br />1" Displacement 25 $37,227 ,000 0
<br />1 -' /2' Displacement 50 $730 $74,447 $6,000 $126,600
<br />2" Displacement 80 $910 $119,115 $9,600 $202,560
<br />2" Mueller MVR 115 $910 $171,224 $9,600 $291,180
<br />2" Omni C2 160 $1,640 $236,230 $9,600 $405,120
<br />3" "' 400 $2,050 Contact Staff $21,000 $1,012,800
<br />4" 800 $3,280 Contact Staff $60,000 $2,0
<br />25,600
<br />6"
<br />"'
<br />1600
<br />$5,330
<br />Contact Staff
<br />$120,000
<br />$4,051,200
<br />
|