My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2017
>
030717
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2017 8:52:36 AM
Creation date
3/1/2017 9:32:57 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/7/2017
DESTRUCT DATE
15Y
DOCUMENT NO
04
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Meal service shall be limited only to residents and overnight guests, except that in the C-C district, a restaurant <br /> may be approved as part of the use permit for a bed and breakfast inn. <br /> C. No receptions, banquets, or other commercial gatherings shall be permitted unless approved as part of the use <br /> permit for a bed and breakfast inn in the C-C district. <br /> D. Small bed and breakfasts and bed and breakfast inns shall conform to the requirements of the county health de- <br /> partment,the uniform building code, and Title 24 of the California Administrative Code. <br /> E. Parking shall be provided on-site as provided in Sections 18.88.030 and 18.88.040 of this title. (Ord. 1636 § 10, <br /> 1994) <br /> Article IV.Conditional Use Permits for Medium and Large Electricity Generator Facilities <br /> and Medium and Large Fuel Cell Facilities <br /> 18.124.280410 Procedure. <br /> A. Applications for large electricity generator facilities and large fuel cell facilities shall be processed in accordance <br /> with Article I of this chapter,with the following exceptions: <br /> 1. Notice of public hearings shall be given to all property owners within the city of Pleasanton. <br /> 2. The applicant shall pay all costs of said noticing in subsection(A)(1) of this section, including administra- <br /> tive costs. The cost of each notice shall be established by resolution of the city council. <br /> B. Applications for medium electricity generator facilities and medium fuel cell facilities shall be processed in ac- <br /> cordance with Article I of this chapter,with the following exceptions: <br /> 1. Notice of all required public hearings shall be given to all property owners within one and a half miles of <br /> the property where the facility is proposed to be located. <br /> 2. The applicant shall pay all costs of said noticing in subsection (B)(1) of this section, including administra- <br /> tive costs. The cost of each notice shall be established by resolution of the city council. (Ord. 1880,2003) <br /> 18.124.390420 Standards. <br /> In addition to making the findings in Section 18.124.070 of this chapter, the decision making body shall make the fol- <br /> lowing findings before granting a use permit for medium or large electricity generator facilities, and medium or large <br /> fuel cell facilities: <br /> A. The facilities shall use the best available control technology to reduce air pollution. <br /> B. The facilities shall not create any objectionable odors at any point located outside of the property plane where the <br /> facilities are located. <br /> C. The facilities shall not exceed a noise level of 45 dBA at any point on any residentially zoned property outside of <br /> the property plane where the facilities are located. <br /> D. The facilities shall be cogeneration or combined cycle facilities, if feasible. <br /> E. Toxic and hazardous chemicals shall not be routed through existing or proposed residential neighborhoods. <br /> F. In no case shall electricity generator facilities and fuel cell facilities exceed 49.9 megawatts in size. If there are <br /> electricity generator facilities and fuel cell facilities on site, in no case shall the aggregate wattage of the facilities <br /> exceed 49.9 megawatts in size. <br /> G. The fuel source for electricity generator facilities shall be natural gas,bio diesel, or the byproduct of an approved <br /> cogeneration or combined cycle facility. <br /> H. On a site with electricity generator facilities, medium fuel cell facilities shall not be permitted unless the aggre- <br /> gate wattage of the two facilities is either: (1) 10 megawatts or less, or(2)if the aggregate wattage is greater than <br /> 10 megawatts,no electricity is exported off site. If the aggregate wattage is greater than 10 megawatts in size, and <br /> some electricity is exported off site, the fuel cell facilities shall be subject to all requirements and processes pre- <br /> scribed in this title for large fuel cell facilities in the applicable zoning district. <br /> I. On a site with fuel cell facilities, medium electricity generator facilities shall not be permitted unless the aggre- <br /> gate wattage of the two facilities is either: (1) 10 megawatts or less,or(2) if the aggregate wattage is greater than <br /> 10 megawatts,no electricity is exported off site. If the aggregate wattage is greater than 10 megawatts in size, and <br /> some electricity is exported off site, the electricity generator facilities shall be subject to all requirements and <br /> processes prescribed in this title for large fuel cell facilities in the applicable zoning district. <br /> 84 <br />
The URL can be used to link to this page
Your browser does not support the video tag.