Laserfiche WebLink
drainage would drain into biofiltration planters that would filter contaminants from the parking <br /> lot and roof drainage before entering the arroyos and, ultimately, the bay. Erosion control and <br /> dust suppression measures will be documented in the building permit plans and will be <br /> administered by the City's Building and Safety Division and Engineering Division. The sites <br /> are not located within an Alquist-Priolo Earthquake Fault Zone. The flood hazard maps of the <br /> Federal Emergency Management Agency (FEMA) indicate that the subject property is not <br /> located in a flood hazard zone. <br /> Therefore, staff believes that this finding can be made. <br /> 5. Whether streets and buildings have been designed and located to complement the <br /> natural terrain and landscape: <br /> The project sites are in a developed area of the City and would not involve the extension of <br /> any new public streets. The building and parking areas would be located on level areas of the <br /> sites. The proposed buildings will be compatible in size and scale with surrounding structures. <br /> New landscaping would be installed to mitigate the loss of the existing trees. <br /> Therefore, staff believes that this finding can be made. <br /> 6. Whether adequate public safety measures have been incorporated into the design of <br /> the plan: <br /> The public improvements associated with these projects would be consistent with the TOD <br /> Standards and Guidelines and City design standards. The driveway entrances are located and <br /> configured to provide adequate line-of-sight viewing distance in both directions perpendicular <br /> to the vehicle, and to facilitate efficient ingress/egress to and from the project sites. All on-site <br /> drive aisles meet TOD and City standards for emergency vehicle access and turn-around. <br /> Adequate access is provided to all structures for police, fire, and other emergency vehicles. <br /> Buildings are designed to meet the requirements of the Uniform Building Code and other <br /> applicable City codes and all buildings would be equipped with automatic fire suppression <br /> systems (sprinklers). <br /> Although the sites are not located within an Alquist-Priolo Earthquake Fault Zone, it would be <br /> subject to seismic shaking during an earthquake. The State of California provides minimum <br /> standards for building design through the California Building Standards Code. The California <br /> Uniform Building Code is based on the UBC and has been modified for California conditions <br /> with numerous more detailed and/or stringent regulations. Specific seismic safety <br /> requirements are set forth in Chapter 23 of the UBC. The State earthquake protection law <br /> requires that buildings be designed to resist stresses produced by lateral forces caused by <br /> earthquakes. The City implements the requirements of the California Building Code through its <br /> building permit process. The proposed projects will be required to comply with the applicable <br /> codes and standards to provide earthquake resistant design to meet or exceed the current <br /> seismic requirements. Site specific soils analyses would be conducted in conjunction with the <br /> building permit review. <br /> PUD-85-08-12D, PUD-81-30-86D, and P11-0856 Planning Commission <br /> 23 of 25 <br />