My WebLink
|
Help
|
About
|
Sign Out
12
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2017
>
030717
>
12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2017 3:00:33 PM
Creation date
3/1/2017 9:51:27 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/7/2017
DESTRUCT DATE
15Y
DOCUMENT NO
12
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pleasanton TOD Standards and Desian Guidelines <br /> The following street and pedestrian improvements should be incorporated as site <br /> improvements when the adjoining development on sites 1,2 and 3 is constructed, <br /> and/or when the Transit Village street/path improvements can be funded *. More <br /> detailed descriptions of the recommended public improvements that can occur over <br /> time, see the applicable PART 3 Development Standards and Design Guidelines: <br /> o Owens Drive between Willow Road and the eastern boundary of Site #1 <br /> • Diagonal parking on the south side of the street <br /> • Attached widened sidewalks - both sides <br /> • New street and sidewalk landscaping <br /> o Owens Drive at Iron Horse Trail <br /> • In coordination with East Bay Regional Park District, The City, and <br /> adjoining property owners, a new pedestrian crossing connecting the <br /> BART Plaza with a new small plaza on the south side of Owens adjacent <br /> to the Iron Horse Trail. <br /> o Willow Road from the BART Station to Stoneridge Drive <br /> • Parallel parking with landscaped park strip - both sides with residential <br /> uses <br /> o Gibraltar Drive between Hacienda Drive and Willow Road <br /> • Diagonal parking from Hacienda Drive to the new pedestrian connector <br /> • Parallel parking from the pedestrian connector to Willow <br /> • Appropriate sidewalk and landscaping improvements per the <br /> street/parking section <br /> o Pedestrian/bike pathway from Owens Drive at Iron Horse Trail to Gibraltar Drive <br /> • Allow for connections to the internal pedestrian circulation of Site 1 <br /> • Allow for a connecting branch along the north side of Site 2 which <br /> connects to the existing residential communities east of Hacienda Drive <br /> and to the internal pedestrian circulation of Site 2. <br /> • Separated pedestrian and bike path with connections into adjoining <br /> projects, with landscaping on both sides <br /> • If pedestrian path to Hacienda Drive is built, coordinate on-demand <br /> pedestrian crossing location with Iron Horse Trail crossing <br /> * Note - Improvements could be funded by grant money, the City of Pleasanton, <br /> current and future developers at the time of project construction, or a combination of <br /> these and other sources to be determined on a project by project basis. <br /> City of Pleasanton - 8 - ADOPTED 03/01/11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.