Living Arroyos Program 12017-18 Workplan I Exhibit A <br /> Monitoring: Monitor oak overall growth,spacing and survival in Zone A and C in Spring/Summer <br /> 2018(May-,July). For Zones A and C,this should include tabulated survival rates and species <br /> identification. <br /> NOTE:Coordinate With Zone 7 prior to initiating survival monitoring. Zone 7 may have staff or consultants <br /> dedicated to this task depending on the project needs. <br /> Photo documentation:Annual photo of site in Spring/Summer 2018(May—July). Photo <br /> documentation showing progress year after year at 5 or more vantage points <br /> Reporting: Prepare an annual monitoring report due by December:15,2018. <br /> r, <br /> Estimated Number of Work Days , <br /> , . tea_ _ _.. . _ .-.� . .. ..�. .. _ . � �.,r-. - e.-.r.. .t .— � ,-,..,--4,: <br /> TOTAL weer days , #of volunteer days <br /> Planting ., 10 ,'LL,> 2 <br /> Maintenance t' 45 '� ;,. 5(add as needed) <br /> Monitoring 2 <br /> _ fm <br /> 'Reporting - V =3 f% , , <br /> 90 r I Other:Willow Stake Harvest Y <br /> 4 r <br /> k* r ` i C -.,A yr <br /> 'd' <br /> N_ E <br /> IiL. <br /> g.5.-;;PT— j5' j5 7,S' `' ' ,{a``..s` 1 <br /> Rr t� <br /> F ..4>. <br /> t t <br /> a <br /> I1 <br />ithin the watershed. <br /> Maintenance:implement fifth gear.of maintenance plan described in permit requirements: <br /> • Zone A'Weedswillbbe cleatedfb hand from around oung trees three times per year for the first <br /> five ye as:springy{MVJarch-June) fall(Septembtraovember)and winter(December-February). <br /> Hartwater plants Weekly� per ye <br /> durin ry spells or monthly if plant condition indicates it is sufficient. <br /> • Zone-4,fylow weeds three times ea r: late winter(February), late spring (May), and late <br /> summer Ati ust . p. � <br /> • Zone C: Hand..water oaks during dry spells and monthly if plant condition indicates it is <br /> necessary. <br /> (1) Replenish mulch twice per year:fall (October/November)and spring (March/April). <br /> (2) Remove o.rradjusttcages if oak growth becomes impeded. <br /> (3) Evaluate'i i eglit,species individually to determine whether immediate action is <br /> necessary. <br /> • Channel: Remove drift debris(fallen limbs, etc.,that have drifted into the project area)from <br /> center of channel; it can be moved to the side of bank or removed from channel entirely so as to <br /> allow free flow of water. <br /> NOTE:Early(February--March)weeding promotes establishment of native grasses,and the early spring weed- <br /> whacked materials should be left onsite as weed suppression, as appropriate. Also plan for weeding of Zones A, <br /> a and C in early fall-just prior to LARPD s fall application of chemical control(please coordinate.with Robert <br /> Martinez on timing). This material should not be left onsite in order to allow the chemical control to penetrate to <br /> the soil. <br /> 10 <br />an LARPD employee. <br /> 3 <br /> distributing material) <br /> • Secure sponsors for clean-up supplies and refreshments and send out thank you cards to <br /> sponsors after events. <br /> • Register outside volunteers for Spots 1, 8, 9, and10(e.g., identify spot needs, send out email <br /> invitations and follow-up with site captains and volunteers). <br /> 2 <br />