Living Arroyos Program 12017-18 Workplan I Exhibit A
<br /> ,
<br /> Project Name Estimated Project Budget
<br /> B5 RESTORATION SITE MAINTENANCE TBD
<br /> Stream Name Project Location
<br /> Line B-5/Pleasanton Canal On south side of Pleasanton Canal,just upstream
<br /> of access point at Haleakala Rd.
<br /> Project Length (ft.) Project Area (acres)
<br /> 500 ft 0.1 acre
<br /> Project Goals: .. }
<br /> This"demonstration"project was completed in 2012 to learn a'ddtional native vegetation would
<br /> improve bank stabilization. Our goal is to demonstrate if native plants and shrubs can improve bank
<br /> stability. .,,,,,,,,-.,z
<br /> PROJECT SCOPE FOR 2017-18 `" am
<br /> `, ''
<br /> v -":. .
<br /> ,
<br /> Maintenance: Living Arroyos staff will: 1% i-
<br /> 1. Mow non-native understory plants two time r year, eaail spring 2018(March)and late
<br /> summer 2018(August/Sept)., - . ,}h`' ¢
<br /> 2. Limb up healthy trees and shrubs to encourage fr+ee`flow of winter/flood flows in fall of 2017;
<br /> this should be limited to healthy,<pjant that are ready limb(Do not over prune). Pruned
<br /> willow limbs may be of use at other pre tes.(Check in with Zone 7 prior to limb activities)
<br /> k
<br /> Monitoring:Annual monit ing�for overall g wth, spacingi and sur liva'irin spring 2018(March/April).
<br /> Photo documentatio :An
<br /> n nual p1 otos to show} egress s year's`#erzyear at 5 vantage points in
<br /> spring 2018(March/ApiiO g
<br /> Reporting Annual stand-alone rep�br s requested'w ycontents including: pate and activities
<br /> performed;Documentation ofoverall°`healtli spacing,survival of plants and recommendations for
<br /> future maintenance. Rem., due June30, 2018
<br /> ,r. rte, ,,;;, -, -
<br /> t
<br /> Estimated Number of Work Days 4 , , ..
<br /> „ � , TOTAL work days #of volunteer days
<br /> c..x t. zv+•-”
<br /> Planting � ,, „,,,_,I, 0
<br /> Maintenance 4 4,,i, , .,. •' 2
<br /> Monitoring . 0.5
<br /> Reporting 0.5
<br /> 13
<br />ring (March/April).
<br /> (2) Remove o.rradjusttcages if oak growth becomes impeded.
<br /> (3) Evaluate'i i eglit,species individually to determine whether immediate action is
<br /> necessary.
<br /> • Channel: Remove drift debris(fallen limbs, etc.,that have drifted into the project area)from
<br /> center of channel; it can be moved to the side of bank or removed from channel entirely so as to
<br /> allow free flow of water.
<br /> NOTE:Early(February--March)weeding promotes establishment of native grasses,and the early spring weed-
<br /> whacked materials should be left onsite as weed suppression, as appropriate. Also plan for weeding of Zones A,
<br /> a and C in early fall-just prior to LARPD s fall application of chemical control(please coordinate.with Robert
<br /> Martinez on timing). This material should not be left onsite in order to allow the chemical control to penetrate to
<br /> the soil.
<br /> 10
<br />an LARPD employee.
<br /> 3
<br /> distributing material)
<br /> • Secure sponsors for clean-up supplies and refreshments and send out thank you cards to
<br /> sponsors after events.
<br /> • Register outside volunteers for Spots 1, 8, 9, and10(e.g., identify spot needs, send out email
<br /> invitations and follow-up with site captains and volunteers).
<br /> 2
<br /> |