Laserfiche WebLink
Living Arroyos Program 12017-18 Workplan I Exhibit A <br /> , <br /> Project Name Estimated Project Budget <br /> B5 RESTORATION SITE MAINTENANCE TBD <br /> Stream Name Project Location <br /> Line B-5/Pleasanton Canal On south side of Pleasanton Canal,just upstream <br /> of access point at Haleakala Rd. <br /> Project Length (ft.) Project Area (acres) <br /> 500 ft 0.1 acre <br /> Project Goals: .. } <br /> This"demonstration"project was completed in 2012 to learn a'ddtional native vegetation would <br /> improve bank stabilization. Our goal is to demonstrate if native plants and shrubs can improve bank <br /> stability. .,,,,,,,,-.,z <br /> PROJECT SCOPE FOR 2017-18 `" am <br /> `, '' <br /> v -":. . <br /> , <br /> Maintenance: Living Arroyos staff will: 1% i- <br /> 1. Mow non-native understory plants two time r year, eaail spring 2018(March)and late <br /> summer 2018(August/Sept)., - . ,}h`' ¢ <br /> 2. Limb up healthy trees and shrubs to encourage fr+ee`flow of winter/flood flows in fall of 2017; <br /> this should be limited to healthy,<pjant that are ready limb(Do not over prune). Pruned <br /> willow limbs may be of use at other pre tes.(Check in with Zone 7 prior to limb activities) <br /> k <br /> Monitoring:Annual monit ing�for overall g wth, spacingi and sur liva'irin spring 2018(March/April). <br /> Photo documentatio :An <br /> n nual p1 otos to show} egress s year's`#erzyear at 5 vantage points in <br /> spring 2018(March/ApiiO g <br /> Reporting Annual stand-alone rep�br s requested'w ycontents including: pate and activities <br /> performed;Documentation ofoverall°`healtli spacing,survival of plants and recommendations for <br /> future maintenance. Rem., due June30, 2018 <br /> ,r. rte, ,,;;, -, - <br /> t <br /> Estimated Number of Work Days 4 , , .. <br /> „ � , TOTAL work days #of volunteer days <br /> c..x t. zv+•-” <br /> Planting � ,, „,,,_,I, 0 <br /> Maintenance 4 4,,i, , .,. •' 2 <br /> Monitoring . 0.5 <br /> Reporting 0.5 <br /> 13 <br />ring (March/April). <br /> (2) Remove o.rradjusttcages if oak growth becomes impeded. <br /> (3) Evaluate'i i eglit,species individually to determine whether immediate action is <br /> necessary. <br /> • Channel: Remove drift debris(fallen limbs, etc.,that have drifted into the project area)from <br /> center of channel; it can be moved to the side of bank or removed from channel entirely so as to <br /> allow free flow of water. <br /> NOTE:Early(February--March)weeding promotes establishment of native grasses,and the early spring weed- <br /> whacked materials should be left onsite as weed suppression, as appropriate. Also plan for weeding of Zones A, <br /> a and C in early fall-just prior to LARPD s fall application of chemical control(please coordinate.with Robert <br /> Martinez on timing). This material should not be left onsite in order to allow the chemical control to penetrate to <br /> the soil. <br /> 10 <br />an LARPD employee. <br /> 3 <br /> distributing material) <br /> • Secure sponsors for clean-up supplies and refreshments and send out thank you cards to <br /> sponsors after events. <br /> • Register outside volunteers for Spots 1, 8, 9, and10(e.g., identify spot needs, send out email <br /> invitations and follow-up with site captains and volunteers). <br /> 2 <br />