Living Arroyos Program I 2017-18 Workplan I Exhibit A
<br /> D ,.
<br /> Project Name Estimated Project Budget
<br /> WILLOW BIOTECHNICAL BANK TBD
<br /> STABILIZATION REHABILITATION
<br /> (AS NEEDED)
<br /> Stream Name a Project Location
<br /> multiple multiple
<br /> Project Length(ft.) Project Area (ams)
<br /> 37
<br /> various various -1,•.01,4,-v
<br /> u
<br /> Project Goals: ep!;
<br /> Add additional willow stakes to 2014-15 biotechnical bank}stabiliza ,sites, as needed,and
<br /> reduce erosion. F _,,
<br /> PROJECT SCOPE FOR 2017-18 . t '�A r
<br /> Planting: ''''', N.,,,4442 v4,t,„
<br /> • Locate, harvest and install willoW stakes in FallIW rater 2017. m-
<br /> • Stakes will be 1"to 3"in diamete.sad-98"to 36"lora
<br /> • Stakes will be soaked in water fora ijinimum of 3 days ad up to a week.
<br /> • When installed, stakes will be poungcLed in' ,ae ground `of its length.
<br /> NOTE:Coordinate with 7 n"orto collecti g end installing.wilk +s. The'ie`nay be restrictions on the species
<br /> of willow that can beeriseddat a given site. .-''''',Z°f"' �.,
<br /> Photo documentationefore and�after photo. ¢`t,
<br /> Reporting ifotlowing info nation wilt,ereporte�p„
<br /> • Notaibeir af'stak install and speed "s ,
<br /> • Length of treitrileWlineaVipgth of staites:or fascine installed)
<br /> • Brief description of tr atmenf( =g., stakes,fascine,two tier fascine)
<br /> • Brreflocation of installation, GPS coordinates and written description including which bank.
<br /> r_ T' a„r,, �`.:
<br /> IiiI4 VA,
<br /> Estimated`Number oftWork'Days s<
<br /> { `n , , TOTAL work days #of volunteer days
<br /> Planting 10
<br /> Maintenance
<br /> Monitoring
<br /> Reporting
<br /> 15
<br /> 14
<br />ork Days 4 , , ..
<br /> „ � , TOTAL work days #of volunteer days
<br /> c..x t. zv+•-”
<br /> Planting � ,, „,,,_,I, 0
<br /> Maintenance 4 4,,i, , .,. •' 2
<br /> Monitoring . 0.5
<br /> Reporting 0.5
<br /> 13
<br />ring (March/April).
<br /> (2) Remove o.rradjusttcages if oak growth becomes impeded.
<br /> (3) Evaluate'i i eglit,species individually to determine whether immediate action is
<br /> necessary.
<br /> • Channel: Remove drift debris(fallen limbs, etc.,that have drifted into the project area)from
<br /> center of channel; it can be moved to the side of bank or removed from channel entirely so as to
<br /> allow free flow of water.
<br /> NOTE:Early(February--March)weeding promotes establishment of native grasses,and the early spring weed-
<br /> whacked materials should be left onsite as weed suppression, as appropriate. Also plan for weeding of Zones A,
<br /> a and C in early fall-just prior to LARPD s fall application of chemical control(please coordinate.with Robert
<br /> Martinez on timing). This material should not be left onsite in order to allow the chemical control to penetrate to
<br /> the soil.
<br /> 10
<br />an LARPD employee.
<br /> 3
<br /> distributing material)
<br /> • Secure sponsors for clean-up supplies and refreshments and send out thank you cards to
<br /> sponsors after events.
<br /> • Register outside volunteers for Spots 1, 8, 9, and10(e.g., identify spot needs, send out email
<br /> invitations and follow-up with site captains and volunteers).
<br /> 2