Laserfiche WebLink
Living Arroyos Program I 2017-18 Workplan I Exhibit A <br /> D ,. <br /> Project Name Estimated Project Budget <br /> WILLOW BIOTECHNICAL BANK TBD <br /> STABILIZATION REHABILITATION <br /> (AS NEEDED) <br /> Stream Name a Project Location <br /> multiple multiple <br /> Project Length(ft.) Project Area (ams) <br /> 37 <br /> various various -1,•.01,4,-v <br /> u <br /> Project Goals: ep!; <br /> Add additional willow stakes to 2014-15 biotechnical bank}stabiliza ,sites, as needed,and <br /> reduce erosion. F _,, <br /> PROJECT SCOPE FOR 2017-18 . t '�A r <br /> Planting: ''''', N.,,,4442 v4,t,„ <br /> • Locate, harvest and install willoW stakes in FallIW rater 2017. m- <br /> • Stakes will be 1"to 3"in diamete.sad-98"to 36"lora <br /> • Stakes will be soaked in water fora ijinimum of 3 days ad up to a week. <br /> • When installed, stakes will be poungcLed in' ,ae ground `of its length. <br /> NOTE:Coordinate with 7 n"orto collecti g end installing.wilk +s. The'ie`nay be restrictions on the species <br /> of willow that can beeriseddat a given site. .-''''',Z°f"' �., <br /> Photo documentationefore and�after photo. ¢`t, <br /> Reporting ifotlowing info nation wilt,ereporte�p„ <br /> • Notaibeir af'stak install and speed "s , <br /> • Length of treitrileWlineaVipgth of staites:or fascine installed) <br /> • Brief description of tr atmenf( =g., stakes,fascine,two tier fascine) <br /> • Brreflocation of installation, GPS coordinates and written description including which bank. <br /> r_ T' a„r,, �`.: <br /> IiiI4 VA, <br /> Estimated`Number oftWork'Days s< <br /> { `n , , TOTAL work days #of volunteer days <br /> Planting 10 <br /> Maintenance <br /> Monitoring <br /> Reporting <br /> 15 <br /> 14 <br />ork Days 4 , , .. <br /> „ � , TOTAL work days #of volunteer days <br /> c..x t. zv+•-” <br /> Planting � ,, „,,,_,I, 0 <br /> Maintenance 4 4,,i, , .,. •' 2 <br /> Monitoring . 0.5 <br /> Reporting 0.5 <br /> 13 <br />ring (March/April). <br /> (2) Remove o.rradjusttcages if oak growth becomes impeded. <br /> (3) Evaluate'i i eglit,species individually to determine whether immediate action is <br /> necessary. <br /> • Channel: Remove drift debris(fallen limbs, etc.,that have drifted into the project area)from <br /> center of channel; it can be moved to the side of bank or removed from channel entirely so as to <br /> allow free flow of water. <br /> NOTE:Early(February--March)weeding promotes establishment of native grasses,and the early spring weed- <br /> whacked materials should be left onsite as weed suppression, as appropriate. Also plan for weeding of Zones A, <br /> a and C in early fall-just prior to LARPD s fall application of chemical control(please coordinate.with Robert <br /> Martinez on timing). This material should not be left onsite in order to allow the chemical control to penetrate to <br /> the soil. <br /> 10 <br />an LARPD employee. <br /> 3 <br /> distributing material) <br /> • Secure sponsors for clean-up supplies and refreshments and send out thank you cards to <br /> sponsors after events. <br /> • Register outside volunteers for Spots 1, 8, 9, and10(e.g., identify spot needs, send out email <br /> invitations and follow-up with site captains and volunteers). <br /> 2 <br />