Laserfiche WebLink
Living Arroyos Program 12017-18 Workplan I Exhibit A , <br /> S <br /> Project Name Estimated Project Budget <br /> ARROYO MOCHO SITE 9 RESTORATION TBD <br /> AREA <br /> Stream Name Project Location <br /> Arroyo Mocho Summertree Drive <br /> Project Length (ft.) Project Area (acres) <br /> 15 ft 0.04 acre <br /> Project.:Goals: ',. <br /> Mitigate temporary and <br /> g p ry permanent impacts from Stream Maintenance Program Activities at this <br /> site. -, .y+ <br /> PROJECT SCOPE FOR 2017-18 � <br /> Planting: Living Arroyos staff will oversee volu to t planting (following-theapproved planting plan) <br /> in December 2017/January 2018. Plants will be sourced by ACRCD. <br /> Maintenance: Staff will coordinate and conduct penodic trash moval following.toe Adopt-A-Creek <br /> Spot logging and reprocedures c i4M <br /> Watering: Living Arroyos staff will water Tants gas needed(final watering schedule TBD upon final <br /> planting plan and alert City staff when plants need replacements. <br /> Monitoring: Living Arroyo;staff pill inspect` antings dnl ra nonth' vomit log to ACRCD and City <br /> detailing maintenancehc�onduote4,plant survivals status-and a yreplan ng that is potentially needed. <br /> -t .i 1. 3 moi'f 5 --,:-..3. <br /> } j <br /> Photo documentation slaving Arroyo staff will`esta'blish photo points and complete pre and post <br /> photographs of work area Oompletetmonthly photographs of planting area for monthly report. <br /> Reporting Not-gitired until fall 2018 _- `_-- <br /> OtherAkstaff and volunteers*engaged in the project must receive environmental training prior to <br /> start of anplanting and/or maintenance activity.. Coordinate with ACRCD to receive training. <br /> _ Stop work if wildlife is present andkconsult t fo.Jogist. Comply with all permit requirements. <br /> :L-Estimated Number of Work Days - <br /> ,:.4- •} .1,-c'Ti TOTAL work days #of volunteer days <br /> Planting A .;*,'` ' <br /> � 2 2 <br /> �`- ,„- <br /> y, 12(24 half days) 6 (12 half days) <br /> Maintenance <br /> Monitoring 12(24 half days) 6( 12 half days) <br /> Reporting 0 0 <br /> Other:Training 0.5 0.5 <br /> Note: Maintenance and monitoring should be conducted during same site visit if possible. <br /> 22 <br /> 12 (24 half days) 6(12 half days) <br /> Monitoring 12(24 half days) 6 (12 half days) <br /> Reporting NA NA <br /> Other: Training 0.5 0.5 <br /> *Note: Maintenance and monitoring should be conducted during same site visit if possible. <br /> 20 <br />romotes establishment of native grasses,and the early spring weed- <br /> whacked materials should be left onsite as weed suppression, as appropriate. Also plan for weeding of Zones A, <br /> a and C in early fall-just prior to LARPD s fall application of chemical control(please coordinate.with Robert <br /> Martinez on timing). This material should not be left onsite in order to allow the chemical control to penetrate to <br /> the soil. <br /> 10 <br />an LARPD employee. <br /> 3 <br /> distributing material) <br /> • Secure sponsors for clean-up supplies and refreshments and send out thank you cards to <br /> sponsors after events. <br /> • Register outside volunteers for Spots 1, 8, 9, and10(e.g., identify spot needs, send out email <br /> invitations and follow-up with site captains and volunteers). <br /> 2 <br />