My WebLink
|
Help
|
About
|
Sign Out
05
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2017
>
041817
>
05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2017 2:23:59 PM
Creation date
4/11/2017 4:16:17 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/18/2017
DESTRUCT DATE
15Y
DOCUMENT NO
05
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIRSTCARBON Proposal <br /> SOLUTIONS '' <br /> Trellis EIR for the Jewish Community Center- Pulte Group Project,Walnut Creek,CA <br /> FCS prepared an EIR for the Trellis Residential Project,which consists of 53 single-family homes and <br /> associated improvements on 5.28 acres of an 8.15-acre site in Walnut Creek,California.The project site <br /> currently includes a vacant 35,635-square-foot community center,a parking lot, an outdoor pool, a <br /> children's play area,various accessory structures,and a commercial landscape nursery, in addition to a <br /> portion of the City's Tice Valley Park and Gym.As part of the project,the existing community center and <br /> associated structures would be demolished. However,the Tice Valley Community Gymnasium would <br /> remain in place on roughly 2.87 acres of the project site.The project generated significant public interest <br /> and involvement, primarily related to concerns about existing flooding of Tice Creek and the potential for <br /> the project to exacerbate the issues of transportation and congestion of local roadways,the effect the <br /> project would have on pedestrian safety due to a lack of sidewalks and bicycle lanes in the project <br /> vicinity, compatibility with surrounding densities, and the proposed change from an open space <br /> designation to a residential designation. <br /> FCS prepared a comprehensive analysis of the effects of the project, including effects upon Tice Creek <br /> and upon traffic levels of service and pedestrian safety.The project included the provision of new <br /> sidewalks and pedestrian crosswalks to enhance safety,which directly addresses this issue. When <br /> additional public concern over flooding and pedestrian safety was raised at the Planning Commission <br /> hearing, FCS was asked to provide further analysis of these issues for the City Council. FCS and the City <br /> identified an acceptable third party to peer review the documentation included in the Draft EIR. <br /> Additional clarification was provided as part of the City Council packet, but the third-party review <br /> confirmed that the project would not contribute to any exacerbation of flooding and would actually <br /> improve the existing condition by treating more stormwater flows on site.The EIR was certified and the <br /> project was approved by the City Council in December 2015. <br /> Reference:Jeremy Lochirco,Senior Planner,City of Walnut Creek,925.256.5899 <br /> Kaiser Dublin Medical Center EIR, City of Dublin,CA <br /> FCS recently completed a project-level Environmental Impact Report (EIR)for the development of an <br /> approximately 1.2-million-square-foot medical center on 58 acres in eastern Dublin.The proposed <br /> medical center includes a 950,000-square-foot medical campus and a 250,000-square-foot commercial <br /> component.The Project would be constructed in three phases over 24 years.The EIR addressed <br /> maximum potential development to ensure all future development options are covered by CEQA.The <br /> EIR also provided updated transportation analyses in compliance with the forthcoming CEQA <br /> amendments resulting from SB 743. FCS recently completed the Final EIR, inclusive of responses to <br /> comments made by the public and agencies on the project. FCS's analysis was thorough and generated <br /> very little public comment. No public speakers attended the Planning Commission hearing, and the City <br /> Council considers the project on September 20,2016. <br /> Reference:Jeff Baker,Assistant Community Development Director, Phone: (925)833-6610 <br /> NORTH AMERICA I EUROPE 1 AFRICA I AUSTRALIA I ASIA 34 <br /> FIRSTCARBONSOLUTIONS.COM <br />
The URL can be used to link to this page
Your browser does not support the video tag.