Laserfiche WebLink
FIRSTCARBON Proposal <br /> SOLUTIONS <br /> aviation safety risks). Topics that will be addressed include agriculture and forestry resources;geology, <br /> soils, and seismicity; mineral resources; population and housing, and recreation. <br /> Other CEQA Required Sections <br /> This section will address the CEQA-required issues of significant environmental effects that cannot be <br /> avoided (CEQA Guidelines Section 15126(b)), significant irreversible environmental changes(CEQA <br /> Guidelines Section 15126(c)), growth inducement (CEQA Guidelines Section 15126(d)), and energy <br /> conservation (CEQA Guidelines Appendix F). <br /> Persons and Organizations Consulted/List of Preparers <br /> In accordance with CEQA Guidelines Section 15129,the EIR will identify all agencies, organizations, and <br /> individuals consulted during the preparation of the document,as well as the agency representatives and <br /> firms that were involved with EIR preparation. <br /> References <br /> This section will list all resources used in the preparation of the EIR. <br /> Technical Appendices <br /> Pursuant to CEQA Guidelines Section 15147,supporting technical information will be appended to the <br /> EIR as technical appendices. This includes but is not limited to technical studies, modeling data, and <br /> correspondence. <br /> Deliverables <br /> • Ten (10) hard copies of the Administrative Draft HR to the City of Pleasanton <br /> • One (1) electronic version of the Administrative Draft EIR to the City of Pleasanton <br /> Task 5: Second Administrative Draft EIR <br /> Because of the complexity of the project, FCS will prepare a second Administrative Draft EIR as requested <br /> by the City. The Second Administrative Draft andUpon receipt of final City staff comments on the <br /> Administrative Draft EIR, FCS will prepare a Screencheck Draft EIR that shows changes in track. <br /> Deliverables <br /> • Ten (10) hard copies of the Second Administrative Draft EIR to the City of Pleasanton <br /> • One (1) electronic version of the Second Administrative Draft EIR to the City of Pleasanton <br /> Task 6: Screencheck Draft EIR <br /> Upon receipt of final City staff comments on the Administrative Draft EIR, FCS will prepare a Screencheck <br /> Draft EIR that shows changes in track. <br /> NORTH AMERICA I EUROPE I AFRICA I AUSTRALIA I ASIA 21 <br /> FI RSTCARBON SO LUTIONS.CO M <br />