Laserfiche WebLink
FIRSTCARBON Proposal <br /> SOLUTIONS" <br /> Task 9: Screencheck Final EIR <br /> Once City staff provides comments on the Administrative Final EIR, FCS will prepare a Screencheck Final <br /> EIR that shows changes in track. <br /> Deliverables <br /> • Ten (10) hard copies of the Screencheck Draft EIR to the City of Pleasanton <br /> • One(1) electronic version of the Screencheck Final EIR to the City of Pleasanton <br /> Task 10: Final EIR <br /> Once City staff provides final comments on the Screencheck Final EIR, FCS will proceed with finalizing <br /> and producing the Final EIR for public review.This task assumes technical staff time will be required to <br /> complete revisions to the Final EIR, plus editing and administrative staff time to prepare the document <br /> for publication. If additional hours are required, we will prepare a budget augment to cover the actual <br /> level of effort. FCS will provide copies of the Final EIR to the City of Pleasanton,which will be responsible <br /> for local distribution, noticing, and posting. FCS will send copies of the Final EIR directly to state agencies <br /> that commented on the Draft EIR. Finally,this scope of work assumes that City staff will prepare and mail <br /> all notices associated with the Final EIR to local agencies and interested parties. <br /> Deliverables <br /> • Fifty(50) hard copies (appendices on CD), and one (1) electronic version of the Final EIR (including <br /> appendices) <br /> • One (1) CD of the Final HR to each public agency that commented on the Draft EIR(FCS will be <br /> responsible for this task) <br /> Task 11: Mitigation Monitoring and Reporting Program <br /> FCS will prepare a comprehensive Mitigation Monitoring and Reporting Program (MMRP), pursuant to <br /> CEQA Guidelines Section 15097.The MMRP will contain all mitigation measures identified in the EIR. <br /> This comprehensive MMRP will provide City staff with a single source of reference to the full range of <br /> mitigation measures to be implemented. For each measure or group of similar measures,the agency <br /> responsible for ensuring proper implementation will be identified, along with the timing and method of <br /> verification. Copies of the MMRP will be included in the Final EIR submittal. <br /> Deliverables <br /> • One (1) electronic version (PDF format)of the MMRP to City of Pleasanton <br /> Task 12: Notice of Determination <br /> FCS will prepare the Notice of Determination and provide it to City staff or applicant for filing with the <br /> Alameda County Clerk's Office within 5 business days of HR certification. As indicated in this scope of <br /> NORTH AMERICA I EUROPE/AFRICA I AUSTRALIA I ASIA 23 <br /> FIRSTCARBO NSO LUTI ONS.CO M <br />