Laserfiche WebLink
• Epoxy coating(Pantone 512 purple) is required for all non-galvanized carbon steel. <br /> • Provide ventilation equipment and louvered openings as recommended (SPECIFY IN QUOTE). <br /> Air conditioning is not required for operations personnel, but provide as required for <br /> equipment. <br /> • Pipe Supports: Located as recommended (SPECIFY IN QUOTE), material shall be galvanized steel <br /> OR stainless steel <br /> SKID <br /> • Skid Material: Galvanized carbon steel,aluminum (with isolation from concrete pad)or <br /> stainless steel (SPECIFY IN QUOTE) <br /> • Anchorage: Supply seismic anchorage calculations prepared by a Registered Structural n:ineer <br /> in the State of California and shall be in compliance with California Building Cod- ' 2016. <br /> • City TESCO Panel:Skids shall be designed to accommodate City's TESCO panel: <br /> o Weight: 350 pounds <br /> o Height: 36 inches <br /> o Width: 30 inches <br /> o Depth: 12 inches <br /> o Clear Space in front: 48 inches <br /> o Mounting Type: "Wall Mount" (provide suitable surface or structural member on skid) <br /> • Provide vibration isolators <br /> • Maximum Skid Dimensions: 26.5 feet x long 12 feet wide x 7 feet high <br /> • Dehumidifier**t;size as recommended. <br /> • HVAC: Provide forced air and louvers in enclosure walls/doors to provide minimum 10 air <br /> changes per hours**t <br /> ** HVAC and dehumidifier may be mounted to enclosure instead of skid.Air change and dehumidifier <br /> systems can be combined. <br /> t If walk-in fiberglass enclosure is not provided by the equipment supplier,this equipment shall be <br /> excluded from the equipment supplier's bid. In this case, provide two 20-amp circuits to accommodate <br /> dehumidifier and HVAC. <br /> CONTROL REQUIREMENTS/INCLUSIONS: <br /> • Discharge Pressure Control, pump operation as described above <br /> • Programmable Logic Controller(PLC) (SPECIFY IN QUOTE) <br /> o 20 percent spare I/O beyond that required for internal package controls and <br /> communication to/from the City's TESCO panel <br /> • Accommodate communication of alarms and status to Owner's TESCO panel and accepting and <br /> responding to remote control commands from City TESCO panel. Remote control capability <br /> shall fully mirror local PLC controls. <br /> o Skid design shall incorporate a remote terminal strip(s)for wiring between PLC and <br /> TESCO panel. Terminate all wires to/from PLC at terminal strip(s)to allow City's <br /> Contractor to make final connections to TESCO Panel. <br /> City of Pleasanton <br /> RW Booster Station Request for Quotation 5 <br />