My WebLink
|
Help
|
About
|
Sign Out
18
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2017
>
050217
>
18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2017 4:14:35 PM
Creation date
4/27/2017 10:20:17 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
5/2/2017
DESTRUCT DATE
15Y
DOCUMENT NO
18
Document Relationships
18 ATTACHMENT 08
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2017\050217
18 ATTACHMENT 09
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2017\050217
18 ATTACHMENT 12
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2017\050217
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
138. The project shall comply with the "Construction General Permit" requirements of <br /> the NPDES Permit for construction activities (including other land disturbing <br /> activities) that disturb one acre or more (including smaller sites that are part of a <br /> larger common plan of development). <br /> Information related to the Construction General Permit is on line at: <br /> • http://www.waterboards.ca.gov/water issues/programs/stormwater/constr <br /> uction.html <br /> • http://www.waterboards.ca.gov/water issues/prog rams/stormwater/docs/fi <br /> nalconstpermit.pdf <br /> a. The Construction General Permit's requirements include, but are not <br /> limited to, the following: <br /> i. The project developer shall obtain a construction general permit <br /> (NOI) from the Regional Water Quality Control Board to discharge <br /> stormwater, and to develop and implement stormwater pollution <br /> prevention plans. <br /> ii. The project developer shall submit a Stormwater Pollution <br /> Prevention Plan (SWPPP) to the City Engineer/Chief Building <br /> Official for review and approval prior to the issuance of a grading or <br /> building permit, whichever is sooner. A copy of the approved <br /> SWPPP, including all approved amendments, shall be available at <br /> the project site for City review until all engineering and building <br /> work is complete and City permits have been finaled. A site <br /> specific SWPPP must be combined with proper and timely <br /> installation of the BMPs, thorough and frequent inspections, <br /> maintenance, and documentations. SWPPP for projects shall be <br /> kept up to date with the projects' progress. Failure to comply with <br /> the most updated construction SWPPP may result in the issuance <br /> of correction notices, citations, and/or stop work orders. <br /> iii. The project developer is responsible for implementing the following <br /> Best Management Practices (BMPs). These, as well as any other <br /> applicable measures, shall be included in the SWPPP and <br /> implemented as approved by City. <br /> 1. The project developer shall include erosion control/stormwater <br /> quality measures on the project grading plan which shall <br /> specifically address measures to prevent soil, dirt, and debris <br /> from entering the public storm drain system. Such measures may <br /> include, but are not limited to, hydroseeding, hay bales, <br /> sandbags, and siltation fences and shall be subject to the review <br /> P16-1384, P16-1386, P17-0155 & PUD-113, Ponderosa Homes II, INC. City Council <br /> Page 27 of 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.