Laserfiche WebLink
Applicant Pamela Hardy <br /> Project Address:6900 Valley Trails Dr <br /> Record Number PU0-113 <br /> September 8.2015 <br /> 16.Homeowners Association — A Homeowners Association needs to be <br /> established to assume ownership and maintenance of the bio-retention areas, <br /> landscaping, etc. <br /> 17.Vesting Tentative Tract Map—The Vesting Tentative Tract Map will need to be <br /> revised to reflect the development plan comments within this letter. Please be <br /> aware that the Pleasanton Municipal Code prohibits processing the Vesting <br /> Tentative Tract Map until a development plan has been approved. Staff will work <br /> with you to process the Vesting Tentative Tract Map such that it will be <br /> considered by the Planning Commission during the second reading of the PUD <br /> development plan by the City Council. <br /> Traffic Division <br /> 18.Americans with Disability Act (ADA) accessible ramps at all crossing locations <br /> will be required and need to be shown on the plans. <br /> 19.Emergency vehicle and truck (i.e., garbage) turning template plans need to be <br /> provided to the City for review with future plan submittals. <br /> 20.The on-street parallel parking will need to meet the Pleasanton Municipal Code <br /> requirement of 8'x20' with a four-foot buffer in-between stalls. The other side of <br /> the streets and courts without parking shown will need to be marked with no <br /> parking signs. Please provide on-street parking stall dimensions on future plan <br /> submittals. <br /> 21.All driveways will need to be a minimum of 22 feet in length, measured from front <br /> of the garage to the interior side of the sidewalk. <br /> 22.The project will be required to provide a minimum of 5-foot sidewalks on both <br /> sides of all streets and courts. <br /> Should you have any questions regarding the Traffic Division comments, please contact <br /> Matthew Nelson, Traffic Engineer, at (925) 931-5671 or via email at <br /> manelsontcitvofoleasantonca.gov. <br /> Eneineerin¢t Division <br /> 23.Please submit a project plan sheet, as stated in the stormwater requirement <br /> checklist (page 3, last paragraph) showing: "(1) existing impervious surface area; <br /> (2) impervious surface area to be removed and replaced: (3) any other <br /> Page 8 <br />