My WebLink
|
Help
|
About
|
Sign Out
18 ATTACHMENT 09
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2017
>
050217
>
18 ATTACHMENT 09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2017 12:20:19 PM
Creation date
4/28/2017 12:16:48 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
5/2/2017
DESTRUCT DATE
15Y
DOCUMENT NO
18 ATTACHMENT 9
Document Relationships
18
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2017\050217
18 ATTACHMENT 08
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2017\050217
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Applicant Pamela Hardy <br /> Project Address 6900 Valley Traits Dr <br /> Record Number PUD-113 <br /> September 9. 2015 <br /> 47.Flood Control — Developments creating new impervious areas within the <br /> Livermore-Amador Valley are subject to the assessment of the Development <br /> Impact Fee for Flood Protection and Storm Water Drainage. These fees are <br /> collected for Zone 7 by the City: 1) upon approval of a final map for public <br /> improvements creating new impervious areas; and/or 2) upon issuance of a <br /> building or use permit required for site improvements creating new impervious <br /> areas. Fees are dependent on whether post-project impervious area conditions <br /> are greater than pre-project conditions and/or whether fees have previously been <br /> paid. Ponderosa will need to show a plan that identifies both existing impervious <br /> areas and post-project impervious areas,to determine any differences. <br /> Should you have any questions regarding the comments above, please contact Steven <br /> J. Ellis, Associate Civil Engineer, at (925)454-5000. <br /> Processing <br /> We have tried to provide comprehensive comments on the plans submitted. However, <br /> because substantial changes to the site plan are needed, staff may have additional <br /> comments after receiving revised plans and/or additional information, which cannot be <br /> anticipated at this time. After staff has had an opportunity to review and respond to the <br /> revised plans, staff encourages you to have a neighborhood meeting. The project will <br /> be scheduled for a Planning Commission workshop after Ponderosa has had a <br /> neighborhood meeting and the application is deemed complete. <br /> Please be aware that a CD of all documents and plans will be required once the <br /> application is deemed complete and prior to scheduling a formal public hearing. <br /> Should you have any questions regarding the aforementioned, please do not hesitate to <br /> contact me at(925)931-5613/pamos @citvofpleasantonca.Qov. <br /> Eoest regards, <br /> firI I diP <br /> talie Amos <br /> Associate Planner <br /> Enclosures: CAP Checklist <br /> Complete Streets Policy <br /> Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.