Laserfiche WebLink
0 <br /> DRAFT Preliminary Arborist Report HortScience, Inc. <br /> Valley Trails,Ponderosa Homes Page 11 <br /> 6. All underground utilities,drain lines or irrigation lines shall be routed outside the <br /> TREE PROTECTION ZONE. IF lines must traverse through the protection area,they <br /> shall be tunneled or bored under the tree as directed by the Consulting Arborist. <br /> 7. No materials,equipment,spoil,waste or wash-out water may be deposited, <br /> stored,or parked within the TREE PROTECTION ZONE(fenced area). <br /> 8. Any additional tree pruning needed for clearance during construction must be <br /> performed by a Certified Arborist and not by construction personnel. <br /> Maintenance of impacted trees <br /> Trees preserved at the Valley Trails site may experience a physical environment different <br /> from that pre-development. As a result,tree health and structural stability should be <br /> monitored. Occasional pruning,fertilization,mulch,pest management,replanting and <br /> Irrigation may be required. In addition,provisions For monitoring both tree health and <br /> structural stability following construction must be made a priority. As trees age,the <br /> likelihood of branches or entire trees failing will increase. Therefore,annual inspection <br /> for hazard potential is recommended. <br /> HortScience,Inc.(fitaii.0 <br /> John Leffingwell <br /> Board Certified Master Arborist WE-3966B <br /> Registered Consulting Arborist#442 <br /> Attached: Tree Assessment Form <br /> Tree Assessment Maps <br />