My WebLink
|
Help
|
About
|
Sign Out
18 ATTACHMENT 09
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2017
>
050217
>
18 ATTACHMENT 09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2017 12:20:19 PM
Creation date
4/28/2017 12:16:48 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
5/2/2017
DESTRUCT DATE
15Y
DOCUMENT NO
18 ATTACHMENT 9
Document Relationships
18
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2017\050217
18 ATTACHMENT 08
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2017\050217
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Arborist Report. Revised February 1, 2017. Hort Science, Inc. <br /> The Village at Valley Trails Ponderosa Homes Page 9 <br /> 3. Fence trees to completely enclose the TREE PROTECTION ZONE prior to <br /> demolition,grubbing,or grading. Fences shall be 6 ft.chain link or equivalent as <br /> approved by the City of Pleasanton. Fences are to remain until all construction is <br /> completed. <br /> 4. Trees to be preserved may require pruning to provide construction clearance. <br /> Currently off-site trees#245 and 247 have been identified as requiring pruning <br /> Pruning of off-site trees should be performed with the property owner's <br /> permission.All pruning shall be completed by a Certified Arborist or Tree Worker. <br /> Pruning shall adhere to the latest edition of the ANSI Z133 and A300 standards <br /> as well as the Best Management Practices-- Tree Pruning published by the <br /> International Society of Arboriculture <br /> 5. Structures and underground features to be removed within the TREE PROTECTION <br /> ZONE shall use the smallest equipment, and operate from outside the TREE <br /> PROTECTION ZONE. The consultant shall be on-site during all operations within <br /> the TREE PROTECTION ZONE to monitor demolition activity. <br /> Recommendations for tree protection during construction <br /> 1. Prior to beginning work,the contractors working in the vicinity of trees to be <br /> preserved are required to meet with the Consulting Arborist at the site to review <br /> all work procedures,access routes,storage areas and tree protection measures. <br /> 2. Fences have been erected to protect trees to be preserved. Fences define a <br /> specific TREE PROTECTION ZONE for each tree or group of trees. Fences are to <br /> remain until all site work has been completed Fences may not be relocated or <br /> removed without permission of the Consulting Arborist. <br /> 3. Any excavation within the dripline or other work that is expected to encounter <br /> tree roots should be approved and monitored by the Consulting Arborist. Roots <br /> shall be cut by manually digging a trench and cutting exposed roots with a sharp <br /> saw. The Consulting Arborist will identify where root pruning is required. <br /> 4. If injury should occur to any tree during construction, it should be evaluated as <br /> soon as possible by the Consulting Arborist so that appropriate treatments can <br /> be applied. <br /> 5. Prior to grading,pad preparation,excavation for foundations/footings/walls, <br /> trenching,trees may require root pruning outside the TREE PROTECTION ZONE by <br /> cutting all roots cleanly to the depth of the excavation. Roots shall be cut by <br /> manually digging a trench and cutting exposed roots with a sharp saw or other <br /> approved root pruning equipment. The Consulting Arborist will identify where <br /> root pruning is required. <br /> 6. All underground utilities, drain lines or irrigation lines shall be routed outside the <br /> TREE PROTECTION ZONE. If lines must traverse through the protection area,they <br /> shall be tunneled or bored under the tree as directed by the Consulting Arborist <br /> 7. No materials,equipment, spoil,waste or wash-out water may be deposited, <br /> stored, or parked within the TREE PROTECTION ZONE(fenced area). <br />
The URL can be used to link to this page
Your browser does not support the video tag.