Laserfiche WebLink
are encouraged. <br />(4) The retention and preservation of old water towers, windmills, barns, <br /> and interesting agricultural structures is encouraged. <br />(5) Gates on private streets and driveways which serve more than one <br /> parcel shall not be permitted. <br />(6) Antennas and satellite dishes shall be installed in accordance with the R- <br /> 1-40,000 zoning district. <br />(7) In the event that there is a discrepancy between these regulations or a <br /> circumstance inadequately provided for, the Planning Director shall issue <br /> a written interpretation resolving said issue. A history of these <br /> interpretations shall be kept on file in the Planning Department. <br /> <br />E, Con~t'rur'Hon' <br /> <br />(1) Construction activities are limited to the hours of 8:00 a.m. to 5:00 p.m., <br /> Monday through Saturday. <br /> <br />(2) <br /> <br />The following dust control measures are required: <br />(a) During the construction period, all active unpaved construction <br /> areas shall be watered as needed, or treated with soil stabilizers in <br /> order to avoid dust, and exposed stockpiles of dirt or sand shall be <br /> enclosed, covered, or treated with dust-preventives. <br />(b) If soil material is carried on public or private roads, such roads shall <br /> be swept daily with water sweepers to control dust. <br />(c) In graded construction areas, replacement vegetation shall be <br /> planted as quickly as possible. Graded areas that remain inactive <br /> for ten days or more during the rainy season (i.e., October 1 to <br /> April 1) without permanent replanting should be hydroseeded or <br /> stabilized to inhibit dust. <br />(d) Excavation and grading shall be suspended when winds <br /> (instantaneous gusts) exceed 25 miles per hour. <br /> <br />F. Access-Eoads: Vehicular circulation within some future subdivisions may <br /> require the use of flag lots, common drives, or other private streets, subject <br /> to approval through the minor subdivision process. In those cases where flag <br /> lots are required, deviation of the normal lot width requirements may be <br /> allowed. Road construction standards shall follow the requirements contained <br /> in the Happy Valley Specific Plan, except minor deviations may be allowed <br /> based on individual circumstances and meeting all health and safety <br /> considerations at the time of subdivision or design review approval. <br /> <br />G. Geotechnic=l Con¢i_rl~r_~tion' In conjunction with any development proposal, <br /> a soils/geotechnical report shall be prepared pursuant to the requirements of <br /> the Happy Valley Specific Plan as determined necessary by the Chief Building <br /> <br />Page 7 of 8 <br /> <br /> <br />