Laserfiche WebLink
Chair Allen asked if the reason a dirt road is not a structure is because it does not have <br />asphalt on top of it. <br />Commissioner Balch stated that one can pave over dirt and be done, but obviously, this <br />is going to be a road, base rock and engineered. He indicated that he thinks one could <br />still put base rock in and pavement down and still grade a hill slightly and do the less <br />than four -foot retaining wall, and per se, the road is not a structure. <br />Commissioner Nagler inquired if there is a way to engineer the road with less grading <br />that would be required with that retaining wall. He inquired if the reason a retaining wall <br />is necessary is to retain run -off and stop run -off on the roads; the dirt does not come <br />and overtake the road. <br />Mr. Dolan replied that a retaining wall reduces the amount of grading. He explained that <br />a certain angle can be cut out from the road or a retaining wall can be built and leave <br />the dirt there, but it is more about reducing grading than it is controlling runoff. <br />Commissioner Balch stated that the difficulty he has with this is the grading because he <br />does not want to go against, in principle, the premise that the intent of Measure PP is to <br />protect the hills, and grading takes him out of the game real quick, which means a <br />retaining wall has to go in; but if there is too much retaining wall, it will not meet the <br />requirement either. He noted that he thinks the difficulty is that there is no designed <br />road and there is no engineered road; the grading and the cut -in is unknown, and it <br />appears that there is going to be a bit more grading than just the simple one tractor <br />type. <br />Commissioner Nagler stated that the other thing that is not knows is exactly where the <br />cross -over will exactly be over the creek, so it may be that the construction of the road <br />is impacted by where the creek cross -over is and, therefore, what projection will be <br />used to get up to connect. <br />Commissioner Balch agreed. He stated that if the connection across the creek is <br />placed closer to the Lund Road connection, there will be a steeper road. <br />Chair Allen stated that it sounds like having that information when this item comes back <br />to the Commission would be helpful to everyone. <br />Commissioner Nagler stated that he doubts anyone will design a road. <br />Mr. Dolan explained that it is difficult to get to design something that has not been <br />proposed. He added that one of the reasons staff is comfortable recommending it in a <br />more conceptual manner is that the Tentative Map has to come back to the <br />Commission, and there would be another chance to look at exactly how this ends up <br />being designed if that is what the requirement was. He indicated that he recognizes <br />that by then, the Commission will be past the point of which option to pick. He stated <br />that staff will try and get some of that information if it is so critical for the Commission to <br />arrive at a decision, but he cannot guarantee it. <br />PLANNING COMMISSION MINUTES, June 24, 2015 Page 44 of 54 <br />