My WebLink
|
Help
|
About
|
Sign Out
PC 062415
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
MINUTES
>
2010-2019
>
2015
>
PC 062415
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2017 4:49:59 PM
Creation date
8/10/2017 4:39:30 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
MINUTES
DOCUMENT DATE
6/24/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mr. Dolan said yes <br />Commissioner Balch stated that the irony of this conversation is that in order to save as <br />much of this hillside as possible, putting in a retaining wall must be considered; but by <br />the very nature of Chair Allen's interpretation of Measure PP, that retaining wall <br />obviates the ability to do it at all. <br />Chair Allen replied that unfortunately, that is the situation. She added that it does not <br />sway her vote though because she is still interpreting it just the way it is written. <br />Commissioner Balch stated that the Commission actually had one of those cases <br />recently when Chair Allen was absent, where the Commissioners almost tied on the <br />balcony. He then addressed Commissioner Nagler, as it sound like Chair Allen and <br />Commissioner Piper are pretty strong in their opinions, and asked if he believes this <br />grading is too significant and violates Measure PP's premise to protect and conserve <br />the hillside, and thus must be abandoned in order to protect the hillside, or if this <br />grading, in his view, is acceptable in order to protect the hillside. <br />Commissioner Nagler replied that he predicated his vote on the expectation that there <br />would be a retaining wall because that is too much grading for him. He indicated that <br />when he was out there being shown the property, he asked the question how big the <br />retaining wall would be if it can just go straight up and over. He acknowledged that he <br />was obviously asking an extreme question, but again in an effort to save trees as well <br />as the hillside. In answer to Commissioner Balch's question, he stated that he assumed <br />there would be a retaining wall. <br />Commissioner Balch stated that he was looking at the graphical scale of distance, <br />because the way he looks at this, the grading would basically start at Lot 41 and the <br />goes all the way to Lot 47; and that is a lot of grading, equivalent to about five or six <br />houses. <br />Commissioner Nagler stated that it is still possible to preserve the hillside substantially if <br />Chair Allen is willing to accept a three -foot retaining wall or however it ended up being <br />designed. He indicated that it became pretty clear to him standing out there that that is <br />exactly the trade -off: retaining wall versus grading. <br />Commissioner Balch stated that when he stood up at the top and looked over, it did not <br />seem so significant; but when he stood at the bottom and looked up, it seemed a bit <br />more significant without a doubt, but other hillsides surrounding the knoll seemed even <br />much more significant. He indicated that meeting the requirements of protection under <br />Measure PP is, in his opinion, the right thing. <br />Commissioner Balch then stated that the Commission should now determine if anyone <br />is willing to change his /her vote or not, and if that is the case, the Commission can note <br />on a new motion; otherwise, the Commission should move on. <br />Chair Allen stated that she is not changing her vote and asked Commissioner Balch if <br />he was. <br />PLANNING COMMISSION MINUTES, June 24, 2015 Page 46 of 54 <br />
The URL can be used to link to this page
Your browser does not support the video tag.