My WebLink
|
Help
|
About
|
Sign Out
RES 17976
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2010-2019
>
2017
>
RES 17976
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2017 9:31:19 AM
Creation date
11/13/2017 4:40:06 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
11/7/2017
DESTRUCT DATE
PERMANENT
DOCUMENT NO
17976
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site(s) Implementation Monitoring Monitoring and Reporting Monitoring Verification of <br /> Mitigation Measures Affected Procedures Responsibility Action Schedule Compliance <br /> • Require truck fleets based in the area of the proposed EDZ to meet <br /> CARB's highest engine tier available at the time the building <br /> permits are issued. <br /> Mitigation Measure 4.B-4:If a new sensitive residential use,such as All sites that Site developer shall hire Community Approve air quality consultant Approve Verified by: <br /> senior housing or a child-care or healthcare facility,is proposed within the include a a qualified air quality Development selection. Review verification consultant Date: <br /> EDZ area and within 300 feet of a fuel station or within 1,000 feet of sensitive use consult to prepare a Department from air quality consultant. selection,and <br /> warehouse loading docks or Highway 1-680,the developer of this use such as,but HRA. review verification <br /> shall prepare a health risk assessment report to be reviewed and not limited to, from air <br /> approved by the City.The health risk assessment shall demonstrate that a senior consultant, prior <br /> the increased cancer risks for the proposed sensitive use would be below housing to approval of <br /> the BAAQMD permitting limit of 10 in one million(per its Policy and facility,child- individual <br /> Procedure Manual,the BAAQMD would deny an Authority to Construct care or development <br /> or a Permit to Operate for any new or modified source of TACs that healthcare permit. <br /> exceeds a cancer risk of 10 in one million or a chronic or acute hazard facility,within <br /> index of 1.0);or,should the health risk assessment determine that Verify inclusion of <br /> lifetime cancer risk would exceed 10 in one million,the developer shall 300 to 1,000 approved <br /> install in the sensitive use an enhanced ventilation filtration system such feet of a measures. <br /> that the resultant lifetime increased cancer risk is less than 10 in one source of <br /> million.No sensitive use shall be approved within the EDZ where the TACs. <br /> health risk assessment determines that lifetime cancer risk from the <br /> freeway and from uses in the EDZ would exceed 10 in one million. � 1 <br /> 4.C.Noise — <br /> Mitigation Measure 4.0-la:To address nuisance impacts of All Site developer shall Site developer Engineering Department: Prior to issuance Verified by: <br /> construction activities within the EDZ area,all developers of sites within incorporate the Community Review and approve project of building or Date: <br /> the EDZ area shall ensure that construction contractors implement the specifications of this Development specifications and grading and grading permit, <br /> following: measure into project Department construction plans for inclusion whichever is first. <br /> • Signs shall be posted at all construction site entrances to the specifications as well as of this measure into Field inspections <br /> property upon commencement of construction,for the purposes of grading and Engineering specifications. during <br /> all contractors/subcontractors,their employees,agents, construction plans. Department <br /> material haulers,and all other persons at the applicable construction Community Development construction. <br /> sites,of the basic requirements of Mitigation Measures 4.C-la and DepartmenInspect site during <br /> 4.C-lb. constructionn:to ensure <br /> compliance with project <br /> • Signs shall be posted at the construction sites that include permitted construction plans. <br /> construction days and hours,a day and evening contact number for <br /> the job site,and a contact number in the event of problems. <br /> • An onsite complaint and enforcement manager shall respond to and <br /> track complaints and questions related to noise. <br /> 4.C.Noise(cont.) <br /> Measure 4.0-lb:To reduce daytime noise impacts due to All Site developer shall Site developer Engineering Department: Prior to issuance Verified by: <br /> construction within the EDZ area,all project developers shall require incorporate the Community Review and approve project of building or Date: <br /> construction contractors working within 55 feet of the construction site specifications of this Development specifications and grading and <br /> property boundary to implement the following measures: measure into project Department construction plans for inclusion <br /> • Equipment and trucks used for construction shall use the best specifications as well as Engineering <br /> available noise control techniques(e.g.,improved mufflers, Department <br />
The URL can be used to link to this page
Your browser does not support the video tag.