Laserfiche WebLink
STONERIDGE DRIVE SPECIFIC PLAN AMENDMENUSTAPLES RANCH PROJECT <br />MITIGATION MONITORING AND REPORTING PLAN [May 20101 <br />Date Completed/ <br />Mitigation Measures/Improvement Measures <br />Monitoring Action <br />Responsibility' <br />Timing <br />Signature <br />The City of Pleasanton shall be responsible for implementing the <br />verification: <br />improvement and the signal retiming. <br />City of PleasantonEngineering <br />Division. <br />TR 1.3(a) and S -TR -2.1. Improve Santa Rita Road at Stoneridge Drive <br />Verify that payment has <br />Funding: Project <br />Payment: at time <br />Signature <br />(#32). To reduce project related AM and PM impacts at this intersection, <br />been made to the City <br />Sponsor, to the <br />of the first final <br />the following lane configurations and modifications are recommended: <br />as set forth in the <br />Specific Plan <br />p <br />maximum amount <br />($1.5 million) as set <br />map. <br />Title <br />Amendment. <br />forth in the Specific <br />Date <br />• Restripe one of the Stoneridge Drive right turn lanes to an <br />Plan Amendment; any <br />Construction of <br />eastbound through lane only. <br />Verify construction of <br />amount above that, the <br />improvements: as <br />• Restripe one of the Stoneridge Drive eastbound right turn <br />intersection <br />City of Pleasanton. <br />determined by the <br />improvements. <br />City of <br />lanes to a free right turn lane. <br />Collection: City of <br />Pleasanton. <br />• Construct a northbound Santa Rita Road lane to provide a <br />Pleasanton. <br />separate right turn lane to Stoneridge Drive (east). <br />Implementation: <br />This mitigation will be the financial responsibility of the Project Sponsor <br />construction of <br />improvements/cycle <br />to the maximum set forth in the Specific Plan Amendment. <br />timing: City of <br />Pleasanton. <br />In addition, the City of Pleasanton will change the cycle length to 130 <br />seconds in the AM and to 120 seconds in the PM. <br />These mitigations will improve the AM and PM operations from a LOS F <br />to a LOS D. <br />Also, although not a significant impact requiring mitigation, safety <br />improvements consisting of new traffic signals shall be required at the <br />intersections of Stoneridge Drive and Newton Way; Guzman Parkway and <br />Trevor Parkway. The Project Sponsor shall have the financial <br />responsibility for these improvements as set forth in the Specific Plan <br />Amendment. <br />TR -1.4 Improve Santa Rita Road at Valley Avenue (#34). To reduce <br />Verify payment of <br />Payment of fee: <br />Payment of fee <br />33 <br />